News   Jul 12, 2024
 1.3K     0 
News   Jul 12, 2024
 1.1K     1 
News   Jul 12, 2024
 393     0 

Search results

  1. R

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    They are putting up drywall in front of the original hoarding just like across from Tim Horton's.Looks like they are building the shop skeletons now.
  2. R

    Toronto Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    From Metrolinx Crosstown updates March 20 2017 http://www.thecrosstown.ca/news-media/whats-new/tunnel-invert-concrete-pour-at-allen-rd-and-eglinton Looks like this is the beginning.
  3. R

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I sometimes notice a very slight pause when a freight train is moving fast with the view facing it directly or at an angle.But I get no blurring other than the way the VHS tape was taken. I take the converted MP4 video file and save it to a card that has fast read/write speed. I also have Toast...
  4. R

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    A friend of mine's father retired years ago from CPR. He had collected several VHS tapes of all types of trains,steam,diesel,rail lines etc. One tape was the operations of the Toronto Terminal Railway dated 1997,but there were clips showing before that like when freight was still going through...
  5. R

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    On Metrolinx Crosstown updates,Feb.27 2017: Following the transportation of the crane into the site, the tunnel boring machines, Don and Humber, will be extracted during mid-March and mid-April 2017.
  6. R

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Has any work began under the Eglinton West subway to shore up the tracks/station so as the LRT station can be started to be constructed?
  7. R

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    This has opened now.Both stairs lead into the main corridor in the station.
  8. R

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    When are the TBM's going to be pulled out?
  9. R

    TTC: St. Clair Streetcar Right Of Way

    Well,we now have one favourable change with buses coming now into St.Clair West station using the east streetcar ramp,then going back up the ramp then onto the roadway. All the platform repairs are complete and it looks like the only holdup is the continuing repair to the St.Clair-Yonge Subway...
  10. R

    TTC: St. Clair Streetcar Right Of Way

    Now that the western section is up and running with streetcars again,why no flexes yet? There should be at least one for testing the line.They now have access to Davenport yard. I know they are needed more so elsewhere,but they still should run run one if they are not yet.
  11. R

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    After watching the completion video,I see the tunnel lined all the way with no breaks for stations all the way.So when they dig down to tunnel level to build a station platform,I take it that they remove the tiles necessary to make the underground station that will be at least as long as the LRT...
  12. R

    Ellesmere Road, 1952-2009

    Just to add more info about the Warden-Ellesmere arial photo. It is on City of Toronto archives-Arial photos-Series 12-1963-Map 140 (I found this photo on City of Toronto Archives Arial photos East Toronto of the Warden-Ellesmere bridge under construction.You can clearly see the curved bypass...
  13. R

    Ellesmere Road, 1952-2009

    I found this photo on City of Toronto Archives Arial photos East Toronto of the Warden-Ellesmere bridge under construction.You can clearly see the curved bypass track and the two bridges.Ellesmere now goes straight east/west and Warden goes north/south. No. Wright
  14. R

    Ellesmere Road, 1952-2009

    I found this photo on City of Toronto Archives Arial photos East Toronto of the Warden-Ellesmere bridge under construction.You can clearly see the curved bypass track and the two bridges.Ellesmere now goes straight east/west and Warden goes north/south.
  15. R

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    When in Terminal one.If you are new to it or almost never use it,try finding your way back to the UPX station.There were no postings by the GTAA other than "Trains" I took a ride a week ago and found the ride very good.But after a walk thru Term.1,I got lost and found it difficult to get...
  16. R

    Toronto Celebration Condominiums at Bridlewood | ?m | 11s | Malibu Investments | P + S / IBI

    Target leaving Canada Well,what now?Target just announced today it is leaving Canada.They were one reason some of the Condos were not built because Target did not want big condo buildings blocking the view of the store from Warden or Finch.I doubt Walmart will take it because it is...
  17. R

    Toronto Celebration Condominiums at Bridlewood | ?m | 11s | Malibu Investments | P + S / IBI

    Still nothing as of now from Celebration.Target has been given the approval from the City to build an extension to the south end of the old Zellers but I still don't see any sign of renovations.Some more small stores have closed.A new Bakery has opened that has excellent bread and buns. The new...
  18. R

    Toronto Celebration Condominiums at Bridlewood | ?m | 11s | Malibu Investments | P + S / IBI

    Sorry about my last message.Her first name was wrong. This is her.(LinkedIn wants a Login that I don't have or want) Toronto, Canada Area - ‎Managing Director at Kwan & Kwan Properties Group View Josephine Kwan's (Canada) professional profile on LinkedIn. LinkedIn is the world's largest...

Back
Top