News   Jul 12, 2024
 1.3K     0 
News   Jul 12, 2024
 1.1K     1 
News   Jul 12, 2024
 390     0 

Search results

  1. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    Saturday, March 13 from the breakwall ...
  2. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    FROM ACROSS THE BAY WINDOWS AND CLADDING GOING UP ON THE 10TH LEVEL AMENITY SPACE OF THE EAST TOWER (SEEN FROM THE BACK OF THE BUILDING)
  3. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    Levels 16 & 20 are complete. windows have been installed on most of the first two levels of parking. Some shots from various angles...
  4. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    From: https://nationalpost.com/life/homes/modern-living-signal-boost
  5. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    The building's first windows have been installed, on the west corner, which is designated as retail space.
  6. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    Marketing & sales signage is back up around the site; work on the East Tower's 14th level is underway, as is the 11th level on the West Tower
  7. S

    Toronto Bijou on Bloor | 42.1m | 12s | Plaza | BDP Quadrangle

    I suspect there will be lots of careful, difficult work to be done below grade around — and near — the TTC subway tunnels. Must butt right up against them?
  8. S

    Toronto 2002 Lake Shore West | 122m | 36s | Marlin Spring | Graziani + Corazza

    Brush cleared, trespassing signs up in recent weeks.

Back
Top