News   Jul 12, 2024
 1.2K     0 
News   Jul 12, 2024
 1K     1 
News   Jul 12, 2024
 381     0 

Search results

  1. Tridel

    Toronto 300 Front Street West | 156.05m | 49s | Tridel | Wallman Architects

    300 Front St W Photos from the CN Tower Four shots from the CN Tower looking down at excavation and shoring (Jan 29, 2011- photos by Lorne Chapman) More construction pics from Jan 29, 2011 are on the Tridel's Facebook fanpage gallery.
  2. Tridel

    Toronto James Cooper Mansion | ?m | 32s | Tridel | Burka

    Eldon Garnet's 'Inversion' Installed at James Cooper Mansion Here's the plaque inscription: Inversion Eldon Garnet, 2010 The multi-sited sculptural work is a commentary and a reflection on our urban interaction with nature. Not long ago, the wilderness was considered somewhat threatening and...
  3. Tridel

    Toronto Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    The deepest part is going down 5 levels and the shallowest part is 4 levels.
  4. Tridel

    Toronto Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    January 2011- Excavation Continues at Hullmark Centre Some construction photos of the excavation so far that I posted to our purchaser website MyTridelHome.com.
  5. Tridel

    Toronto Solaris at Metrogate Condos | ?m | 40s | Tridel | Graziani + Corazza COMPLETE

    Solaris Construction photos January 23, 2011 Photography by Lorne Chapman
  6. Tridel

    Avonshire (Yonge/401, Tridel/K&G, 14 + 21 + 3x 22s, Kirkor) COMPLETE

    Revised Tridel Avonshire Masterplan This is the updated masterplan image for the website showing the locations of the two Aristo towers:
  7. Tridel

    Toronto Solaris at Metrogate Condos | ?m | 40s | Tridel | Graziani + Corazza COMPLETE

    Occupancy in the Solaris Towers begins January 29th for the lower floors. Purchasers should check their mail, email or login to MyTridelHome.com for their specific occupancies. Sales Office and 2 model suites should open by March. When common areas are complete we will be arranging for...
  8. Tridel

    Toronto Ventus at Metrogate Condos | ?m | 30s | Tridel | Graziani + Corazza

    Ventus UCIT Construction Camera on top of Solaris UCIT construction camera that will update high res photos every 30 minutes of Ventus construction at Tridel's Metrogate LEED-ND community. Camera is placed on top of the adjacent Solaris tower just to the south.
  9. Tridel

    Toronto Solaris at Metrogate Condos | ?m | 40s | Tridel | Graziani + Corazza COMPLETE

    Construction photos from Jan 5, 2011 by Lorne Chapman
  10. Tridel

    Toronto Solaris at Metrogate Condos | ?m | 40s | Tridel | Graziani + Corazza COMPLETE

    Tridel's construction management company, Deltera, has tentatively targeted late Fall 2011 for the park completion.
  11. Tridel

    Toronto Parc Nuvo at Essex | ?m | 36s | Graziani + Corazza

    January, 2011, construction photography (or go online for live construction photography) More photos from the series below on the Parc Nuvo construction photo gallery
  12. Tridel

    Avonshire (Yonge/401, Tridel/K&G, 14 + 21 + 3x 22s, Kirkor) COMPLETE

    Interior design will be by Alessandro Munge of Munge-Leung Design (http://www.mungeleung.com/). Preliminary concepts and direction are looking fantastic. Munge-Leung designed the interiors of Tridel's Republic of Yonge & Eglinton. I will post renders when they become available. A new masterplan...
  13. Tridel

    Toronto 300 Front Street West | 156.05m | 49s | Tridel | Wallman Architects

    Construction update sent to 300 Front St W purchasers Construction update sent to all Tridel purchasers today by mail, email and mytridelhome.com. "We're pleased to let you know that Construction at 300 Front Street West is progressing well. Shoring is very close to completion and the...
  14. Tridel

    Toronto Rêve | ?m | 14s | Tridel | Wallman Architects

    Reve: 560 Front St W construction photos Nov 30, 2010 posted to Facebook Fanpage http://on.fb.me/fn2vr5
  15. Tridel

    Toronto Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    Hullmark Centre is being developed to LEED standards. Demolition is included in these standards so as much material as possible is diverted from landfill. As you might notice from earlier pictures, demolition was separated so that concrete, steel, copper pipe and wire, etc. can be recycled. The...
  16. Tridel

    Toronto One Old Mill & Two Old Mill | ?m | 12s | Tridel | Kirkor Architects

    Still in the design phase and there is no planned date for the launch of Two Old Mill other than it will be in 2011.
  17. Tridel

    Toronto Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    Hullmark Centre Economic Impact Report Download the Hullmark Centre Economic Impact Report in PDF http://bit.ly/a3JHHI • The total commercial value of Hullmark Centre is $493.7 million • This development will create 2,400 person-years of employment in construction and supporting...
  18. Tridel

    Ultra Ovation (MCC, Tridel/Dorsay, 32s)

    Ultra Ovation Wins Missssauga Urban Design Award Ultra Ovation selected to receive the Mississauga Urban Design Award from Mississauga City Council, November 24th, 2010. http://bit.ly/bDiWKe Congratulations to Tridel/Dorsay Developments and Turner Fleischer architects.
  19. Tridel

    Toronto James Cooper Mansion | ?m | 32s | Tridel | Burka

    Tridel sales rep Tree recommended a hottub on the upper terrace.
  20. Tridel

    Toronto James Cooper Mansion | ?m | 32s | Tridel | Burka

    New James Cooper Mansion 2 Level Penthouse VR A new 2 level penthouse suite design has been added to the website. The suite is about 2515 ft. sq., faces south west and has an extensive terrace on the upper level. James Cooper Mansion Prices and Floorplans

Back
Top