News   Mar 10, 2026
 496     0 
News   Mar 10, 2026
 1K     8 
News   Mar 10, 2026
 524     0 

Recent content by khaldoon

  1. K

    Mississauga Living Arts Centre Precint | ?m | 20s | City of Mississauga

    That common park is very popular with kids and dog owners. I think lots of folks wouldn’t be happy about losing it even if there is a rooftop replacement (which could be anything and may not be as easily accessible.)
  2. K

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    Today A load of cladding packages waiting to be installed. Cladding on the south side of the 8th floor, lowest ceilings so far.
  3. K

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Port Credit station. The glass cladding from a moving GO train.
  4. K

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    Today. Curtain wall cladding on the east side.
  5. K

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    Today. Surprisingly not so much snow is attached to the cladding.
  6. K

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    Today. Cladding has reached the 7th floor and the pattern becomes more square with the low ceiling storeys.
  7. K

    Mississauga M4 at M City | 215.6m | 67s | Rogers Real Estate | Core Architects

    ^ It is good that they seem to be reusing the same RCS from M3.
  8. K

    Mississauga Oro + Edge Towers | ?m | 50s | Solmar | Rosario Varacalli

    That is the smaller southern section of the development. If I am not mistaken it was added to the main tower after they bought out the last holdout parcel of land facing Hurontario. Actually they might’ve been prodded into buying that property by the city after the owner had a change of heart or...
  9. K

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    Today. Crates, presumably containing cladding elements, are waiting on the 6th and 7th floors.
  10. K

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    Today. The 5th floor south side panels were added overnight. I have not seen them doing cladding work during the regular construction shift (7am-3pm). Perhaps they are utilizing the main tower crane to lift these pieces and they have to schedule the work in shifts.
  11. K

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    I think you are correct. Would be interesting to see if the style of windows changes when they do the next two floors, assuming they will be housing mechanical units, and when they get to the residential floors.
  12. K

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    ^ I think the east side of these floors (5 and 6) are mechanical rooms.

Back
Top