News   Dec 23, 2025
 565     3 
News   Dec 23, 2025
 1.3K     1 
News   Dec 23, 2025
 2.1K     1 

Recent content by 44 North

  1. 44 North

    The Fountains Of Toronto

    It would've been well over 20 years ago that it was running, and a hundred percent pre-1990. I might clamber over it when I have time to see if I can find nozzles. The rest of the sculpture has been filled with dirt and plants so won't be able to find a drain. If it is in fact a fountain (It's...
  2. 44 North

    The Fountains Of Toronto

    Alright UTers, sleuthing time or input from those who may remember. Was this concrete sculpture thingy a fountain? And if so when was it built, when did it run from, why was it turned off? Have a vague memory from when I was 6 maybe that my mom told me it was a fountain, and people used to put...
  3. 44 North

    GO Transit Electrification | Metrolinx

    Wild Trillium article. Gotta check my past posting because feel certain most was predicted. Regardless, as long as Prov parties making these GO promises got elected, Metrolinx succeeded.
  4. 44 North

    TTC: Other Items (catch all)

    Fare gates...anyone have injuries from them? I've had them crush my hand on more than one occasion, bash my exposed shin, pretty sure had one close on my neck when I dropped something. There's more that I'm forgetting. And the speed... it's awkward and slow. Disrupts the flow exiting...
  5. 44 North

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Loving the bridge renders. Look exactly as the mind's eye imagined it. That being said, does seem Mlinx continually reduces the catenary masts and wires in the renders. They'll stand out a lot more IRL unfortunately.
  6. 44 North

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    I'd say it is. On the whole, factoring all the evidence and effects of varying weather phenomena, that OCS is less reliable than third rail. One is rigid robust and tucked away, the other is exposed elevated and inherently weaker. And it's the latter that suffers more and results in lesser...
  7. 44 North

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    For intercity or longer-haul overhead is effectively the only option for electrified rail. Can't have third rail at level crossings or around people at that grade, and carrying long distances overhead is superior. Whereas OL is a subway and thus not relevant. The underground portions now...
  8. 44 North

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    I never said never. I said less. Because it is less reliable. And I have provided evidence in the past, which is why I can make the claims - those being that OCS is uglier, less reliable, and costlier than 3rd rail..
  9. 44 North

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    my gosh this project has dragged on too long. Beyond bad and countless black eyes for Metrolinx. Definitely a lot of noise when TYSSE went months late. Surprised not as much noise when it's Crosstown being many years overdue.
  10. 44 North

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Monteal's REM already getting shutdowns due to snow removal from pylons. Overhead power supply: costs more, ugly, less reliable. Makes you wonder why OL won't use third rail.
  11. 44 North

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Exactly. Upload it, then download it, then neglect it. And the west perversely upgraded to subway standards - which somehow will carry fewer riders and defies their core mantra about building things affordably. And even that's been split into a phased sometime whenever project. Eglinton...
  12. 44 North

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Interesting, the pantographs were omitted. Clearly the animators and media relations people want to show something sleek clean and modern. Naturally a panto - and the accompanying masts and wires - makes for a clunkier and less graceful subway.
  13. 44 North

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The "either way" is comparing to TYSSE, the last subway project. Grandiose, costly, over time. We couldn't think it could get worse, nay this was supposed to be so much better. But this is worse.
  14. 44 North

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    bit my tongue on the construction/dbf aspect for too long. this project has dragged to the point it's an embarrassment on a provincial scale. "we're taking over transit because we'll build it faster, cheaper, better". #fail #fail #fail. The centrepiece of the Prov's grand transit plan, cut short...
  15. 44 North

    Problematic Park Design - Why Some Parks Don't Work

    This sand feature has got to be one of the coolest free things for kids in the city. I only discovered it recently, and my kid is a tad bit too old to fully enjoy it. I only wish we knew about it before. A true hidden gem. Building rivers and dams and bridges...child me would've been in heaven.

Back
Top