Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

It wasn't until today when I realized the sheer size of this building! 😮
PXL_20251209_204545800.jpg
PXL_20251209_204435830.jpg
PXL_20251209_204515217.jpg
 

Attachments

  • PXL_20251209_204435830.jpg
    PXL_20251209_204435830.jpg
    260.1 KB · Views: 12
  • PXL_20251209_204545800.jpg
    PXL_20251209_204545800.jpg
    281.9 KB · Views: 15
  • PXL_20251209_204515217.jpg
    PXL_20251209_204515217.jpg
    271.5 KB · Views: 16
Photos taken today, Friday (Dec. 12). Some visible progress compared to my post from last Friday - but not a lot. Several of the Rail Climbing Systems (RCSs) installing the skin have moved up a level - the east one now up to around level 78 - well, higher up on 77, as it's at the mechanical level. And the south one is up to 73. The west and north RCSs are at 76 and 77, respectively, where they were a week ago.

UTIMG_7837.jpg
UTIMG_7674.jpg
UTIMG_7632.jpg
UTIMG_7516.jpg
UTIMG_7235.jpg
UTIMG_7331.jpg
UTIMG_7473.jpg
UTIMG_7439.jpg
UTIMG_7482.jpg
XXIMG_7743.jpg
UTIMG_7149.jpg
UTIMG_7222.jpg
UTIMG_7066.jpg
XXIMG_7044.jpg
XXIMG_6952.jpg
 

Back
Top