Toronto Ontario Line: Minton Portal + Don Valley Crossing Bridge | Metrolinx

It is the west don crossing. I thought you said a couple posts up it should be one thread?
Metrolinx has two similar names for different bridges: 1. Don Valley Crossing Bridge (from Minton Portal and largely parallel Leaside Bridge/Millwood Dr), and 2. West Don Crossing Bridge adjacent the Hydro corridor just south of the former Ontario Science Centre site. I'm largely agnostic as to how many threads there should be, though I think two threads would be better. Whatever works
 
^Well...that answers what's blocking our trail there @abp10...

...also, I am now more convinced the anti-erosion reinforcement of the Don River West Branch here was apart of this project. Not a separate thing which I once thought.

The re-opening date for November doesn't look so promising anymore... Maybe that had to do with something else
 
New CLC is out for Don Valley Crossing & Minton Portal.

Construction update slides:
Pape_Cosburn_and_Minton_Place_CLC-_November_2025_page-0005.jpg
Pape_Cosburn_and_Minton_Place_CLC-_November_2025_page-0006.jpg
Pape_Cosburn_and_Minton_Place_CLC-_November_2025_page-0008.jpg
Pape_Cosburn_and_Minton_Place_CLC-_November_2025_page-0009.jpg
Pape_Cosburn_and_Minton_Place_CLC-_November_2025_page-0011.jpg
Pape_Cosburn_and_Minton_Place_CLC-_November_2025_page-0012.jpg
Pape_Cosburn_and_Minton_Place_CLC-_November_2025_page-0013.jpg
 

Back
Top