WB62
Senior Member
CSA respond to alarms instead
Which is exactly what happens, the CSA responds to all onboard emergencies.
CSA respond to alarms instead
I ride the GO train daily, and usually do so in the accessibility coach since it's centralized, and almost every day I hear on the PA that a crew member is on their way to assist (if this is a widespread vandalism campaign or if there's an epidemic of GO train passengers having emergencies), and not once have I seen the CSA go to assist, it's always one of the crew members.Which is exactly what happens, the CSA responds to all onboard emergencies.
I ride the GO train daily, and usually do so in the accessibility coach since it's centralized, and almost every day I hear on the PA that a crew member is on their way to assist (if this is a widespread vandalism campaign or if there's an epidemic of GO train passengers having emergencies), and not once have I seen the CSA go to assist, it's always one of the crew members.
Most recently this afternoon, I was sitting on the bottom floor of the accessibility coach and an alarm sounded right as we were leaving Union. I could see the CSA the whole time, someone else got on the PA saying that help was on the way, and the CSA remained where he was the whole time. And this has happened a bunch of times in the past few weeks, too.
However, there are several layers to the policy which may restrict when and how the CSA responds to the alarm, which may not necessarily be immediately after the Conductor makes the "Code 10-33" announcement over the PA.
![]()
Metrolinx pauses Lakeshore West track work for Blue Jays ALCS home games
Metrolinx says it’s pausing major track work on the Lakeshore West Line this weekend to help fans get to and from the Toronto Blue Jays’ ALCS home games.www.cp24.com
2 Peter 3:8 states,@crs1026 will be terribly impressed. LOL
I'm sure he's duly awaiting a Metrolinx update on GO Expansion - "Due to the Jays playoff run in 2025, we're now 4 years behind schedule. Who knew those weekends were so crucial? Not us! "
Variation on Biblical quote for the above; " a day with Metrolinx is like a 1,000 days...." (I was tempted to stick to years....... LOL)
I’ve seen it and not nearly enough to reduce overcrowding on major GO bus routes like the Milton and 407 bus corridors!!![]()
The new train schedules effective October 27 have been uploaded.
![]()
The new train schedules effective October 27 have been uploaded.
Does this schedule also show the service increase to Niagara starting on Nov. 1st?@reaperexpress is duly notified.
Lakeshore West shows seven trips daily running east from Confederation, at 5:50am, 6: 51am, 7:38am, 11:08am, 2:04pm, 7:07pm, 9::02'
Ok........weirdly.......only six trips go back the other way.
****
GO Niagara (weekend) doesn't make a whole lot of sense to me.
Departs Union at: 9:04am, 11:09am, 5:07pm, 8:18pm.
The overcrowded run was the early run, it would have made sense to me to have 2 departures fairly close together.
****
New peak service LSE , I'm not going to parse the run times right now, don't have time. I do not, no express, all local, all-stop, with every 10 minute service for a good chunk of the AM
From Whitby, ever 10M, 6:28am to 7:58am
View attachment 688106
New Barrie Schedule:
View attachment 688107
New Stouffville Schedule:
View attachment 688108




