ShonTron
Moderator
Member Bio
- Joined
- Apr 24, 2007
- Messages
- 12,536
- Reaction score
- 9,528
- Location
- Ward 13 - Toronto Centre
New proposal for Downtown Brampton, located just north of the CN railway, across Main Street from the GO Station.
http://www.brampton.ca/EN/City-Hall...ing - Rose Garden Residences Inc. Ward 1.pdf
Each of the three towers has pretty small floor plates, and each has two elevators. Looks like an average of eight units per floor per tower. I wonder if this is purpose-built rental; condos have traditionally not sold well in Downtown Brampton. It is also the second proposal for the site, which at one point, the city was hoping would be developed into a hotel.
The site is underused, with old auto repair shops, industrial laundromat, and an adult store located in a re-purposed service station. It's also in the historic Etobicoke Creek floodplain, though there haven't been any flooding problems since the diversion channel was built after the 1948 flood.
http://www.brampton.ca/EN/City-Hall...ing - Rose Garden Residences Inc. Ward 1.pdf
Proposal highlights
• Three high-rise mixed-use buildings ranging between 23-27 storeys in height;
• One 3-storey stacked townhouse building;
• A total of 596 residential units;
• Up to 5,205 square metres of commercial/office space;
• Two access points from Nelson Street;
• Listed heritage resource at 7 Church Street East is proposed to be retained; and
• A total of 645 parking spaces
Each of the three towers has pretty small floor plates, and each has two elevators. Looks like an average of eight units per floor per tower. I wonder if this is purpose-built rental; condos have traditionally not sold well in Downtown Brampton. It is also the second proposal for the site, which at one point, the city was hoping would be developed into a hotel.
The site is underused, with old auto repair shops, industrial laundromat, and an adult store located in a re-purposed service station. It's also in the historic Etobicoke Creek floodplain, though there haven't been any flooding problems since the diversion channel was built after the 1948 flood.