Nobu Residences Toronto | 157m | 45s | Madison Group | Teeple Architects

got it right

Active Member
Member Bio
Joined
May 25, 2013
Messages
252
Reaction score
235
Location
King Township
Are they pouring that western slab to act as a staging area for excavation similar to what we're seeing at The One and 57 Spadina? I believe that side is still to be excavated down 5/6 levels
I've been trying to figure that out as well. It can't be temporary because they have roughed in some mechanical into the slab. A set of drawings would sure be great.
 

Top