Not the best pics but, here are some shots I took on my latest site visit where you can see some of the curvature from the ground level.

20251104_092423.jpg20251104_092415.jpg20251104_092356.jpg
 
Lots of heat haze from 4400metres away but looks like they have made significant progress since my last shot. I'll have to send the Mini3pro up in the coming days.
1763498250210.jpeg
 
Last edited:
Nov 29
They are enclosing the damper area

Nov 22
Shot from Islington Ave overpass
54951754327_56259ca85c_o.jpg

54952942655_a82b3f1712_o.jpg

54952892429_699c2eb177_o.jpg
 
I didn't fly this today (yet) but here is another 4.4km shot from the Nikon P950 while I was on my way out to shoot other projects. It looks like the two additional horizontal cross members have been installed since my last flight November 22.
1764436489333.jpeg
 
Nov 30
54976463684_d1c8bea35f_o.jpg

54976512345_7d2a0205b7_o.jpg

From the 401
54976215341_bd4e843937_o.jpg

54976463824_d7e2a49998_o.jpg

54976215376_65ed5d013f_o.jpg
 
Dec 4
54984159933_6e2dcf755f_o.jpg


Dec 02
More up on my site
54982260938_1a1a061ddc_o.jpg

54982260888_b1ede239a0_o.jpg

54982892883_5792f9b5ff_o.jpg

54983002755_30f5ebe3c9_o.jpg

54982706041_83a82c5cc5_o.jpg
54982706376_fa7302d3f0_o.jpg
 
Are we getting closer to an updated date on when they will begin to close the top off and start curving it out?
If you look at @Tim MacDonald photos especially post #869, you will see a lot of wall plates where steel beam still have to be place. I see nothing for the northside. By the looks of things, still a fair amount of equipment still to be install. It also looks like some steel columns have to be installed before steel beams can be place on the south end.

It will be sometime in Q1 of 2026 before enclosure take place and subject to weather, especially the winds with the winds saying when X can be lift into position.
 