Early on while the supports were being formed. The old lift bridge carrying Gio rail over the old pre bypass section of the Welland Canal.
Shore ramps being constructed.
Beams set, work shutdown till March for concrete deck construction.
Shore ramps being constructed.
Beams set, work shutdown till March for concrete deck construction.