News   Jun 21, 2024
 3.7K     6 
News   Jun 21, 2024
 1.4K     2 
News   Jun 21, 2024
 1.6K     1 

Search results

  1. A

    Toronto 265 Balliol | 91.43m | 27s | Park Property | BDP Quadrangle

    Took a little walk between the raindrops. Couldn't find the building permit but you can see what I mean by it looks like they've started shoring at the south end of the site.
  2. A

    Toronto 265 Balliol | 91.43m | 27s | Park Property | BDP Quadrangle

    Pretty sure this one should be updated to under construction. I can grab a picture next time I walk by but there's a pile driver on site. Looks like shoring work has begun.

Back
Top