News   Dec 11, 2025
 23     0 
News   Dec 10, 2025
 1.9K     1 
News   Dec 10, 2025
 966     5 

Search results

  1. E

    Cycling infrastructure (Separated bike lanes)

    Harbord: north side curbs going in west of Grace. Surface asphalt east of Grace is all done Winona: old surface removal starting at Eglinton going south. This is a contra flow renewal and maybe minor extension Silverthorn: resurfacing done Rockwell to St Clair with contra flows painted to...
  2. E

    Cycling infrastructure (Separated bike lanes)

    Sorry I meant Brunswick, I corrected it
  3. E

    Cycling infrastructure (Separated bike lanes)

    I’ve been doing an inventory of bikeway renewals and looks like Havelock (College to Bloor) and Brunswick (Lowther to Bloor) are done. Road renewals done with sharrows only include MacDonell (Wabash to Wright) and Haldon Ave
  4. E

    East Don Trail Project

    I passed a mobile hydraulic crane driving in from the south portal. I think it might be for removing the temporary construction bridge frame
  5. E

    Cycling infrastructure (Separated bike lanes)

    The surface of Harbord is done from Bathurst to Grace excluding some top layer gaps mostly on the south side. From Grace to Ossington the old surface is now removed and forms are going in for curbs along the south side track. Also the re-surfacing of Palmerston from College to Dundas appears...
  6. E

    Cycling infrastructure (Separated bike lanes)

    A few pics from this morning Dr Emily Stowe Way was repaved with the slip lane from Surrey Pl removed and a left turning bike box painted at the College St end. Construction on Bedford Rd has started with plans for new bike lanes from Bloor to Lowther Harbord’s top layer of asphalt is...

Back
Top