Search results

  1. B

    TTC: Major Operational Issues (Various)

    According to my husband, who commuted downtown from the west end shortly after service resumed this morning, he rode a TR on Line 2.
  2. B

    The Junction

    I drove by what was formerly the KN Rubber manufacturing facility at 35 Cawthra, and found that it is now a pile of demolished bits. I wasn't able to look too closely, but at the very least the part I've highlighted below was gone. It's possible the whole place is gone, but I wasn't able to get...
  3. B

    Toronto Bike Share

    I noticed that a dock was recently installed at Dupont & Lansdowne. It fills what was a bit of an awkward gap.
  4. B

    Toronto The Diamond | 101.14m | 36s | Neudorfer | Gabriel Bodor

    How exciting. Here's what it looks like from behind.
  5. B

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    Following last week's unplanned trackwork, this directive was released on March 6th implementing weekly walking inspections of the Pearson Subdivision.
  6. B

    Toronto Galleria On The Park | 154m | 48s | Almadev | Hariri Pontarini

    According to the cover letter from the Draft Plan of Condominium for Galleria III, the remaining portion of Galleria Mall is slated to be demolished in Q4 of this year.
  7. B

    Toronto 189 Old Weston | 128m | 39s | Limen Developments | TACT

    One positive of this latest update is that it appears to have pedestrian connectivity from Old Weston through to Lindner.
  8. B

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    The underpass at Paton Rd is finally opening!* *temporarily, apparently
  9. B

    Toronto Wallace Emerson Community Centre & Park | ?m | 3s | Almadev | Perkins&Will

    I sent an email to the Senior Project Coordinator for the community centre regarding the weight machines (or lack thereof), and received the following response:
  10. B

    1515 Dupont ( 1515 Dupont LP, ?s, ?)

    I noticed this today. Address is 1507 Dupont, but that appears to be part of the same empty lot.
  11. B

    Junction Triangle

    Junction Triangle Library looks very close to opening.
  12. B

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    There are workers out today at the northern terminus, by the stairs from Turntable down to Davenport.
  13. B

    Toronto 1492 St Clair Avenue West | 58.25m | 18s | Blockwall Masonry 18 | KFA

    Yesterday afternoon I saw a crew out drilling/sampling on this property.
  14. B

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Here's the current state of the Davenport end. I'm curious to see how they're going to use this end for access - off Foundry and through the hydro corridor (see chain link fences in 3rd image), perhaps? The stairs have seen better days...
  15. B

    Toronto 30 Powerhouse | 28.44m | 6s | Neudorfer | AREA

    There was a delivery of cladding material today.
  16. B

    Toronto 2363 Eglinton Avenue West | 138.5m | 43s | 1764174 Ontario Inc | RAW Design

    This appears to be new to the AIC - an application for a 43s residential building at the corner of Eglinton Ave West and Caledonia. Proposed to have 638 residential units, and 184 parking spaces...
  17. B

    Toronto K01 Condos | 98.4m | 30s | Worsley Urban | Studio JCI

    There's more advertising material up on-site.
  18. B

    Toronto Public Library Catch-All

    Junction Triangle Library has signage now, and the inside is (somewhat) coming along.
  19. B

    Toronto 30 Powerhouse | 28.44m | 6s | Neudorfer | AREA

    Aisle 24 imminent (well, as imminent as anything has been for the project)