Search results

  1. F

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    I think youre right, its EX1 and EXS that are well above ground. EX2 is just above ground and EX3 is a hole.
  2. F

    Richmond Hill Y9825 | ?m | 22s | Metroview | Wallman Architects

    Crane on site...now the real fun begins
  3. F

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Yes thats EX1, the 2nd building way above ground looks like EXS which shares podium with EX1 (pink top).
  4. F

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Im a bit confused, please clarify with pic below which building is which.(T1 is EX1, T2 is EX2?)
  5. F

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Thanks, EX2 is at least 2 yrs out by the looks of things.
  6. F

    Richmond Hill Y9825 | ?m | 22s | Metroview | Wallman Architects

    Seems like Metroview wants to finish the 8888 project before starting work on Y9825.
  7. F

    Toronto Quay House | 73.15m | 21s | Empire | Kirkor

    Q1 2023 update
  8. F

    Toronto Quay House | 73.15m | 21s | Empire | Kirkor

    Nice, almost at grade
  9. F

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Yes youre right EX2 and EX3 are to the left, EX2 is in the back and looks underway with the crane, EX3 is in the front and is just doing grading
  10. F

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Any activity yet on the other side for EX2 and EX3?
  11. F

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Exactly...occupancy for any of these buildings may start 2025.
  12. F

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Thanks, looks like EX2 wont be occupying fall 2024 as advertised. EX1 is supposed to start occupancy fall 2023.