News   Jul 10, 2024
 1.1K     0 
News   Jul 10, 2024
 547     0 
News   Jul 10, 2024
 785     0 

Search results

  1. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Not sure what triggered the police activity tonight (Sept 20), but there are at least 5 police cars around the site, and they went in with flashlights. Also used the bullhorn to call to someone they thought was inside. Shortly after they packed up and drove away.
  2. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    So here we are at the end of year 4 (since the initial ground breaking) and above ground level 6 is beginning to emerge (Sept 2021).
  3. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Progress as of June 2021. It is amazing to see how many loads of cement have been delivered to the project.
  4. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Some close-up shots (June 2021) of the crane delivering a bucket of cement to the crew, and they skillfully pour it into the wooden framing to create the walls of each apartment unit. The floor and walls for level 3 is taking shape.
  5. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Some of the walls for the first and second level apartments begin to appear in Feb thru April of 2021, and a lot more construction material is on site.
  6. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    The project reached ground level by August 2020 and the first above ground level begins to take shape by December 2020.
  7. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    BY June and July 2020 there has been much progress on the walls and the floor of the underground level. Staircase has been installed to allow the crew to get up to ground level.
  8. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    From Nov 2019 thru Jan 2020 the boards are wrapped in a protective orange tarp, and the crane is erected. It takes just under 4 mins for the operator to descend at the end of the day.
  9. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    The boards are sprayed with some messy goop (Nov 2019)
  10. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Excavation begins and boards are dropped between the beams to shore up the walls. (Sept thru Nov 2019)
  11. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    The bobcat ensures that a supply of beams are readily available.
  12. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    A close up view of how the drilling rig unloads the dirt which gets scooped up by the bobcat.
  13. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Photos: Drilling rig begins the task of preparing the holes for i-beams and cement is poured to secure them. I thought the cement was used to fill the holes, much like securing a fence post. However, as will be shown later, that is not the case.
  14. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Photos: Another load of i-beams is delivered to project site in September 2019.
  15. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Photos: The drilling rig arrives and begins boring the holes to plant the i-beams. The yellow crane is used to unload more beams (October 2019).
  16. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Photos: Crane unloading the i-beams that will be used to shore up the excavation (July 2019).
  17. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Photos: Preparation to excavate the central core in July 2019.
  18. MarkFullerton

    Mississauga Highlight of Mississauga | ?m | 14s | Hazelton Dev | Arcadis

    Photos: Original site and clearing. Preparation of the sales office was in October 2017, and the land was cleared in June 2019.

Back
Top