News   Apr 19, 2024
 2.7K     1 
News   Apr 19, 2024
 996     3 
News   Apr 19, 2024
 1.6K     3 

Search results

  1. T

    Vaughan 255 Bass Pro Mills Drive | 131.9m | 39s | BentallGreenOak | Hariri Pontarini

    New development proposal south of Vaughan Mills link: https://pub-vaughan.escribemeetings.com/FileStream.ashx?DocumentId=157036
  2. T

    Richmond Hill Sheraton Lands Redevelopment | ?m | 42s | Marriott

    Proposed master site plan: https://pub-richmondhill.escribemeetings.com/filestream.ashx?DocumentId=57418 Proposed massing models views 1 of 2: https://pub-richmondhill.escribemeetings.com/filestream.ashx?DocumentId=57419 Proposed massing models views 2 of 2...
  3. T

    Richmond Hill Sheraton Lands Redevelopment | ?m | 42s | Marriott

    I will oppose this development because there is a lack of traffic on the VIVA rapidway, lol
  4. T

    Markham 8127-8149 Yonge Street (Thornhill) | ?m | 40s | HBNG | Turner Fleischer

    Development Service Public Meeting today (March 28, 2023) https://pub-markham.escribemeetings.com/FileStream.ashx?DocumentId=74270
  5. T

    Brampton Transit/Zum

    Brampton Transit Feb 2023 ridership is out.
  6. T

    GO Transit: Service thread (including extensions)

    Go expansion will reduce Barrie line travel time end to end from 1h 41m currently to under 1h, is that not enough?
  7. T

    Brampton Transit/Zum

    https://www.brampton.ca/EN/residents/transit/plan-your-trip/Pages/Service-Changes.aspx
  8. T

    Markham 8435 Woodbine Avenue | ?m | 35s | Eastside Chevrolet Oldsmobile | Tregebov Cogan Architects

    New development plan in Markham, no documents yet.
  9. T

    Markham Markville Mall Redevelopment | 138m | 45s | Cadillac Fairview | Urban Strategies

    Why every building is separated by some random "green" space? Why is there so much setback from Hwy 7? 3 more towers should be build on top of the "future parking structures". There isn't a good connection from the buildings to the mall -- still need to cross the parking and the roadway. Overall...
  10. T

    GO Transit: Construction Projects (Metrolinx, various)

    At one moment I thought there are solar panel on top of the canopy, btw, metrolinx should do it.
  11. T

    Toronto Ontario Line 3 | ?m | ?s

    6 car Ontario line train and 13 car EMU for GO
  12. T

    Danforth Line 2 Scarborough Subway Extension

    Unfortunately, it will be replaced by a GO Platform. Maybe they can add a light weighted ramp somewhere, the RT platform is great for bike parking.
  13. T

    Toronto Ontario Line 3 | ?m | ?s

    How does 36km/h on 36km translates to roughly 45 mins? 36km/(36km/h)= Also, from the GO Expansion Business Case, it's only 25-27mins from Unionville to Union.
  14. T

    Toronto Ontario Line 3 | ?m | ?s

    The Stouffville GO will have 11 trains going south in AM peak hour according to the business case, that's 5 mins 28 sec headways on average. Not for me, but more regional connectivity is always better. Totally Agree
  15. T

    GO Transit: Service thread (including extensions)

    Even more demand if GO add a stop near Rainbow International Bridge
  16. T

    GO Transit: Service thread (including extensions)

    There is still hidden demand. I will go there If and only if a non-stop bus is printed on the schedule.
  17. T

    2022 Transportation Master Plan (TMP) - York Region

    This is only my imagination. The points are not bus stops. Introducing Local VIVA Purple, where local bus will merge into/branch out of VIVA Purple rapidway (Kennedy to Bathurst) to provide more 1-seat-ride. All travel b/w Vaughan Mills Terminal and Cornell Bus Terminal. Each Branch can...
  18. T

    Toronto Ontario Line 3 | ?m | ?s

    College seems reasonable if you want an East-West corridor every 1km.

Back
Top