News   Jul 12, 2024
 430     0 
News   Jul 12, 2024
 483     0 
News   Jul 12, 2024
 266     0 

Search results

  1. C

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    First phase occupancy is expected to be May 2022, with prices starting at $1100/sqft
  2. C

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    With Phase 1 being built first, and the PATH connection is on Phase 3. Is it fair to say Phase 1 residents will have no access to PATH until much later?
  3. C

    Toronto 4800 Yonge Street | 168.24m | 49s | Menkes | Arquitectonica

    Question, is it possible for a new building to reduce the wind in the area? For example, the building help increase airflow? I find in this area it is extremely windy and some doors do not even close as a result (e.g. Emerald Park)
  4. C

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Sunnray, what should the height of each floor be? I feel my unit is what it should be, I think they cut more off of some floors and not all floors.
  5. C

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    The elevator can go in the storage room located next to the Southbound-end of Yonge Line. It is next to the stairs.
  6. C

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Yes the tunnel isn't part of community benefit. But I believe the reconstruction of the community centre is.
  7. C

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    With the community centre opening this year it should help the visibility of the restaurants too. Shouldn't TTC also be working on making the Anndale/Poyntz Yonge Line entry handicap accessible? Say someone in a wheelchair goes down, won't they be left stuck as there is only turnstile entry...
  8. C

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Targeting LCBO to move to Sheppard Centre would just hurt the residents and small businesses that paid a premium price assuming LCBO would open and have little impact to Bazis. Something worth mentioning is Bazis owns P1 and P2 of Emerald Park Bazis. Is it normal for underground non-resident...

Back
Top