  1. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Emerald Park photo featured in Toronto Star article today https://www.thestar.com/business/2017/03/20/buying-a-condo-though-cheaper-comes-with-its-own-costs.html
  2. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    It's official....Tim Hortons will open tomorrow, Dec 28th.
  3. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    At 11:30am today, I ran into Architect, Rosario Varacalli and two of his staff members at Emerald Park. They were joined by representatives of TTC who were there to conduct an inspection, including the fire safety system. Rosario was on the phone trying to get a key person to the site to go...
  4. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    I was outside on Yonge Street this morning and I noticed that the "LCBO Opening Soon" sign on the windows fronting Yonge street are being removed. This sign has been up there for over a year now with no stock in the store shelves. There is certainly a message being communicated with the...
  5. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Construction on Tim Hortons is behind schedule although progress continues to made, it does not appear that there will be an opening for the next couple of weeks. I would not be surprised if the opening is deferred to Jan 2017. Below are some photos.
  6. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    The Conarch Group continues to make progress in completing the Tim Hortons. The construction is scheduled to be completed by Nov 22, 2016. The opening of this Tim Hortons will add to the long list of locations within close proximity in the NYCC.
  7. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Metro has confirmed that they have not determined a timeline for opening a new grocery store @ Emerald Park. Given this announcement and the time frame that has elapsed, it certainly appears that opening a new store is not a priority for Metro at the moment. In fact I don't expect Metro to be...
  8. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Anyone who loves Caribbean food like I do is going to get excited about the soon to be opening Allwyn’s at Emerald Park. They make perfectly spiced and delicious chicken. Their specialty is the jerk chicken sandwich with coleslaw. The heat of the moist jerk chicken, the creamy slaw and amazing...
  9. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    The subway connection continues to be moving at a snail’s pace. Since the last update, they’ve managed to tile a few floors and stairs (still not complete), add the steel vent cage in the subway tunnel, and install a few signs. I don’t know about anyone else, but the tiles their using in...
  10. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    News update....I've just been informed that Jim Mantua can provide an update on the status of Metro. He is the Vice President of Real Estate for Metro and is responsible for corporate expansion and new store development. His email is jim.mantua@metro.ca and his phone number is 416-234-6113...
  11. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Tim Hortons is officially opening at Emerald Park! The reported ETA is in about a month. This confirms what many of you have already suspected and is welcome news in what is shaping up to be another high profile addition to this condo development. Has anyone else heard of any further...
  12. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Below is a shot of a residential west facing unit. There were no reports of water damage to any residential units in the building. The water damage was strictly limited to the commercial area.
  13. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    The Morning After.....multiple high volume fans are plugged in and continuously running. These powerful fans use efficient, yet powerful motors to create high-velocity airflow that dries up water-damaged areas quickly. The high velocity airflow essentially heightens the rate of moisture...
  14. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    The water is gushing continuously that the roof panels have fallen off. The cleaners and security are scrambling not knowing exactly what to do. Looks like there will be a lot of damage not only to the food court but to some food court tenants as well who have spent $$ renovating their cubicle...
  15. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Moving quickly over to the mall. A few of retailers are starting to pop up. There is also a new hair solon fronting Yonge Street called the MAZE Hair Salon. It will be the first business to open on the Yonge Street side of Emerald Park. Their Grand Opening is on July 16th...
  16. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    As soon as you exit the subway entrance doors you will see an elevator access door and on the right you have access to indoor parking. You may also take 3 small flights of stairs to get to the emarald park mall (all indoors) and exit to street level if you choose.
  17. L

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Some additional photos of the emerald park subway entrance. Below is the subway tunnel construction plan It appears from the plans that only the ttc tunnel and the small entrance lobby will be tiled (see the green highlights I noticed on the plans). The rest of the indoor access leading...