News   Jul 26, 2024
 808     0 
News   Jul 26, 2024
 2K     2 
News   Jul 26, 2024
 1.7K     3 

Search results

  1. peter.d

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    I watched two of the "curved" beams being craned up by one end and they curved even more until the far end left the ground and then they gradually straightened. They are now in place vertically in the centre of the Bathurst Street side. I think when the remaining "curved" beams are vertically...
  2. peter.d

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    The girders are not actually permanently curved, just not properly supported horizontally on the ground. When installed vertically this afternoon they were perfectly straight.
  3. peter.d

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    It appears that It was actually the first stage of dismantling the rig prior to removal from the site.
  4. peter.d

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    A little noisy this morning!
  5. peter.d

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    Don't often get to see the head of one of these up close. Right outside my window 14 floors up!
  6. peter.d

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    That is one humongous mobile crane lifting panels of bricks cut from the facade of the north side. Makes the one on the south side look like a toy!
  7. peter.d

    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    Pumping concrete for the final southern end of the 4 ft thick transfer slab.
  8. peter.d

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    Am I reading this right? There doesn't appear to be condo towers planned on top of the two entrances anymore.
  9. peter.d

    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    No workers on site for two days now?
  10. peter.d

    Toronto Musée Condos | 53.95m | 17s | Plaza | BDP Quadrangle

    Why hasn't the fencing been removed? The park appears finished!
  11. peter.d

    Toronto King Portland Centre and Kingly Condos | 57.6m | 15s | Allied | Hariri Pontarini

    Did Friday's windstorm actually topple the first HVAC unit on the left! There used to be four of them in a row (see my previous photo above). Safety concerns?
  12. peter.d

    Toronto King Portland Centre and Kingly Condos | 57.6m | 15s | Allied | Hariri Pontarini

    At the moment those large naked HVAC units on the roof are spoiling the lines of an otherwise handsome building. Can I assume that they will eventually be screened from view in some way? Hope so!

Back
Top