    Innisfil Sunseeker at Friday Harbour | ?m | 6s | Geranium | Rafael + Bigauskas

    Another building going up at Friday Harbour, not sure if it should have its own page/thread or just leave it in this one for the full area of Friday Harbour @Paclo "Sunseeker @ Friday Harbour" two towers of 6 stories with a large podium/parking level Photos taken Thurs. Aug. 24th, 2023
  2. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Nice to see some progress. Looks like they are almost done the first vertical lift of walls up to B4 Level? Now just to add the slab on grade and we should start seeing some equipment for suspended parking levels starting up (hopefully in June??).
  3. D

    Oakville The Greenwich Condos at Oakvillage | 68.81m | 20s | Branthaven Homes | Kirkor

    @Edward Skira Do we want to update the name "The Greenwich Condos at Oakvillage"? clear distinction from the other Greenwich Village?
  4. D

    Toronto The Pemberton | 215.79m | 68s | Pemberton | a—A

    Looks like it is a very thin concrete "mud slab" which typically have no rebar. The Mat or Raft slab will be poured on top and will have rebar, etc. (like the Crane pad we are seeing being formed in the background)
  5. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    100%, maybe we will see this thing come out of the pit by Christmas/New Years lol 🙃
  6. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Lots foundation work to go, and probably some back fill dirt before getting some floors in, probably won't be out of the pit and above grade for 6+ months.
  7. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    We are 191 pages in on basically a hole in the ground so probably not the first to post something not confirmed? Really was just posting to see if anyone heard anything regarding applications or things that would confirm if anything was actually happening. Which looks like a resounding no.
  8. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Anyone else want to jump in on what I clearly stated was unconfirmed (and just a rumor). Damn lol
  9. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Current project drawings have the building shown as around Level 83 being last residental level then 5 levels of mechanical (difference from Ground Datum to Peak = 299 m) This building is advertised as 95 residential levels, which requires an increase in height to fit those in, which looks to be...
  10. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    hahaha, basically we are seeing large excavations for the structural components that will prevent the walls and columns from just sinking into the dirt.
  11. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Rumors are there are delays on site currently due to waiting for more rebar (increased rebar requirements to the lower walls and footings) as they are bringing the building drawing sets from around 85 stories (299m to peak) to the advertised 95 stories (TBDm). Waiting to see the updated...
  12. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    You are looking at the 2.6m deep raft slab excavation (as well as the Footings below some of the other walls) that is below the Main Elevator Core that will service above ground floor up the the Mechanical floors. These footings (engineers went with local footings under the walls/columns vs the...
  13. D

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Gonna be waiting for a while to see some podium floors with 6 levels below ground at this one 🙃
  14. D

    Toronto The Forest Hill Condominiums | 60.7m | 17s | CentreCourt | BDP Quadrangle

    Im counting around 18 floors of concrete, so likely they are working on concrete walls above Mechanical Penthouse Floor?
  15. D

    Toronto 11 YV | 213m | 62s | Metropia | Sweeny &Co

    Toronto Fire Station 312 (it's an active Fire Hall) 34 Yorkville Ave, Toronto, ON M4W 1L5
  16. D

    Toronto Edenbridge on the Kingsway | ?m | 9s | Tridel | Kirkor Architects

    Anyone pass by here that could confirm if any of the shoring equipment/concrete pours have started for the 1st suspended level of parking?
  17. D

    Oakville North Oak at Oakvillage | ?m | 20s | Minto Group | BDP Quadrangle

    Thanks for the clarification, I am working on shoring/forming drawings for the "Orange" Phase 4 buildings (Tower 4A/4B) and follow these threads for site progress via photos. Looks like we got just earth shoring and starting excavation of the pit thus far based on @bangkok photos.
  18. D

    Oakville North Oak at Oakvillage | ?m | 20s | Minto Group | BDP Quadrangle

    I believe the new one that is starting they are calling "Oakvillage Phase 4A/4B" should a new thread be created for this? @interchange42
  19. D

    Toronto Greenwich Village | 14.27m | 5s | Crown Communities | SRN Architects Inc.

    I'm curious to see when the other 4 townhouse buildings start to emerge from grade level. Currently seeing 3 of the 7 townhouse buildings in these photos by edward :)

Back
Top