News   Jul 19, 2024
 935     0 
News   Jul 19, 2024
 4K     7 
News   Jul 19, 2024
 1.2K     4 

Search results

  1. M

    Roads: Ontario/GTA Highways Discussion

    10k plus people were participating today. In the few sections where today's event was restricted to a single vehicle lane, everyone slowed to a crawl. MGT (and Don trails) are completely insufficient for an event of this size.
  2. M

    TTC: Other Items (catch all)

    A Supplementary Agenda has been added to tomorrow's board meeting with two interesting items... https://www.ttc.ca/All-public-meetings/board/2024/Board-Meeting-May-16?tab=0 10. Notice of Motion – Keeping the 505 Dundas Moving Through Chinatown: Support for Temporary Adjustments to Parking...
  3. M

    East York-Old East York

    Shoppers has moved to a tiny location at 1009 Pape. It's basically the pharmacy counter only now. Metrolinx needs the KFC lot to build an Ontario Line crossover in the tunnel north of Pape Station Source...
  4. M

    TTC: Other Items (catch all)

    Yes, CAA can "tow" your bike if it breaks down: https://www.caasco.com/auto/roadside-assistance/caa-bike-assist
  5. M

    TTC: Other Items (catch all)

    Agreed with the general premise of cutting down on closely spaced stops, but the history here is that TTC converted this particular stop at Warden from Sunday/night to full time, and installed similar stops at Islington, as accessible transfer points given that the bus terminals are not...
  6. M

    TTC: Easier Access Phase III

    Penalties under the AODA only apply when there is a contravention of an AODA accessibility standard. There is nothing currently in the AODA standards linked above that require transit providers to make a subway station accessible, or for that matter, for any organization to retrofit buildings to...
  7. M

    East York-Old East York

    Wasn't this site acquired by Metrolinx for Ontario Line Cosburn Station construction?
  8. M

    TTC: Easier Access Phase III

    The elevators at Lansdowne have been fully operational since December. The media event and ribbon cutting was cancelled because the TTC Chair became unavailable that day, and the next day as well, as he was also absent from the February TTC Board meeting with the vice chair presiding.
  9. M

    Road Safety & Vision Zero Plan

    Fun fact: Kelvin Avenue served as the entrance to Luttrell Loop, where streetcars turned back west, until the opening of the Bloor-Danforth extension to Warden in 1968. Presumably its wider than typical for a side street width for about 45 metres south of Danforth, where it then tapers and...
  10. M

    Nordstrom

    I certainly wasn't their target customer, only ever shopping at their Rack location after all, but they lost me forever as a customer when they expired my loyalty points during the pandemic, during lockdown in Ontario in 2021 when we couldn't even shop in store, and they refused to reinstate...
  11. M

    Toronto 125 O'Connor | 11.1m | 2s | 2315594 Ontario Inc | Turner Fleischer

    Site also includes the neighbouring properties 129-131 O'Connor and 1119-1121 Pape. It was approved by City Council several years ago now, but has remained an empty lot since... http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2015.TE11.3
  12. M

    GO Transit: Service thread (including extensions)

    The Hunter Street lanes were completed in 2021 and are now continuous going past the GO station. They're just not on Streetview (or satellite view) yet
  13. M

    161-173 Gowan Ave

    Possible land assembly by Trolleybus on Gowan Ave? "Field Work in Progress" signs can be found on several of the front lawns of the six detached houses between 161 and 173 Gowan, which is two semi-detached homes west of Pape and just south of the planned Ontario Line Cosburn Station.
  14. M

    Toronto Bike Share

    Station update from last week's Bike Share newsletter. Northern Light has mentioned the new stations already, but note the conversion of some existing stations to e-bike charging stations + the new ones to come.
  15. M

    Toronto 2 Carlton | 251.1m | 73s | Northam | IBI Group

    Very odd park, but I guess it would provide more room for people to wait for the streetcar?
  16. M

    East York-Old East York

    Change of plans. The site is almost certainly going to be used for Ontario Line Cosburn station construction.
  17. M

    TTC: Other Items (catch all)

    His contract presumably is not actually up until mid-2023, if it is actually a 5 year contract, given that he was appointed in July 2018. https://www.thestar.com/news/gta/2018/07/09/rick-leary-tapped-for-top-job-at-ttc.html...
  18. M

    TTC: Easier Access Phase III

    It's not explicitly stated at this previous UT news post , but reading between the lines it seems that is exactly what TTC is doing: "...along with a new main entrance building on the west side of Islington Avenue, connecting directly to the station’s existing concourse level."' "Fulfilling...
  19. M

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    The entire South Parkdale neighbourhood was demolished for the Gardiner: https://spacing.ca/toronto/2017/03/04/lost-streets-south-parkdale/
  20. M

    Toronto Kipling Station Transit Hub | ?m | 2s | Metrolinx | SAI

    Ramp seems to be 3' wide, so the same as the accessible subway fare gates.

Back
Top