  1. kotsy

    Toronto Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    Piling is well underway at the portal site. They've also added a fence with blue cover on top of the barriers along the north side of the GO corridor between the platform and Dufferin Bridge. Eventually they will start to build a retaining wall north of here.
  2. kotsy

    Toronto Ontario Place | ?m | ?s | Infrastructure ON

    Demolition status of The Villages - June 24th
  3. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    June 24 Update Lots to see at the streetcar entrance, which is still operational btw. The replacement busses must've been a temporary thing a few days ago.
  4. kotsy

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    While the delay on the cladding has been a bummer, it's pretty awesome to see the entire structure naked like this. The lines are incredible.
  5. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Pics from yesterday Didn't expect to see a whole section of outer wall on the ground intact. Normally wouldn't share a glitchy panoramic, but I'll almost certainly never get another one with a rainbow from here with the Gardiner in this state.
  6. kotsy

    Toronto 11 YV | 213m | 62s | Metropia | Sweeny &Co

    From yesterday
  7. kotsy

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Looking forward to shooting from here again when Phase 2 is done and there is more sunset reflecting diamonds 😁 Fork in the Road by kotsy, on Flickr Fork in the Road by kotsy, on Flickr
  8. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    June 20 Update. The roadbed and all steel has been removed from the two sections above the GO entrance. They've also finished demolition of the roadbed and steel up to the TTC entrance (save for the steel removal for the 3 westerly sections of the streetcar loop). The point they've reached to...
  9. kotsy

    Streetcar Tracks on Adelaide

    Another angle of the naked tracks on York
  10. kotsy

    TTC: Streetcar Network

    Streetcar service was a bit mangled again tonight. This time one broke down in the Dufferin loop causing a massive back up.
  11. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Demolition is flying along here. In 24 hours they've advanced East by one bent. And I made a mistake in my last post. The TTC section they're almost finished across from is a no public access area, despite the group walking through when I shot this lol. The section adjacent to the paid fare...
  12. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    The work doesn't need to be done before The Ex for GO and TTC to be operational. There hasn't and won't ever be any effect on GO, and the 509 is down to busses for the time being but they can easily just avoid or pause work that affects any service during the CNE.
  13. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    June 18 Update. They've demolished most of the road bed & steel adjacent to the TTC paid zone.
  14. kotsy

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Finally a game I can play!
  15. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Was blessed with a beautiful sunset last week when I filmed this little tour of the site.
  16. kotsy

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Posting this in the correct thread now.
  17. kotsy

    Toronto Bike Share

    New dock going in front of the Princes' Gates @ The Ex