  1. drum118

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    4613 has enter service on 503 from Russell yard. It was moved back to the Barns last week for some work and then moved back to Russell. 4614 has been over at Russell the last few days for final work 4515 has spent time in the service bays after a few days of testing and was back out test...
  2. drum118

    Mississauga Canopy Towers | ?m | 38s | Liberty Development | DIALOG

    April 15 More up on my site: They are working on the 33rd floor
  3. drum118

    GO Transit: Service thread (including extensions)

    Talk about sardine cans!! Putting 1200-1400 riders on 6 car trains is unbelievable and really turning riders off using transit. I guess they have no plans to allow bikes on these sardine trains nor having a bikes coach on these trains.
  4. drum118

    GO Transit: Service thread (including extensions)

    Boy, have you dug deep for my comment that is from 2007 I need to change my horn, so it isn't a run of the mill sound
  5. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    April 15 I have a few shots for the south end of Rathburn overpass next to Hurontario that I shot for the brief time I was out when I had some free time today, and you need the drome folks to get a good shot of the work taking place there. Kingsbridge/Elia intersection was closed off March 25...
  6. drum118

    TTC: Other Items (catch all)

    Statement from TTC CEO Rick Leary on collective bargaining with ATU Local 113 Apr. 15, 2024 The collective agreement between the TTC and ATU 113 expired on March 31. At this point, we are in ongoing negotiations with ATU 113 and we are hopeful that we will reach a fair, negotiated deal. We...
  7. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Part 2 North 403 pier South 403 pier Rathburn
  8. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    April 13 One needs to take dates as to when things will be completed or started with a grain of salt as the record of accomplishment is extremely poor for them these days let alone the past year. Queensway intersection was to see guideway construction Jan 8 to the point miWay had buses on...
  9. drum118

    TTC: Other Items (catch all)

    Let's have the Canning done in public view and televised as vandalism is out of control
  10. drum118

    GO Transit Electrification | Metrolinx

    It was stated by ML CEO and the President at a board meeting before the line open in 2015 that the line would be electrify by 2019. The DMU would either be converted to EMUs at a cost of 0ne million per car or a new fleet would be purchased to replace the DMUs. Since then, the planned UPX yard...
  11. drum118

    Mississauga Alba | 109.1m | 32s | Edenshaw | Core Architects

    April 01 Lot more up on my site
  12. drum118

    General railway discussions

    Alstom concludes the successful demonstration of the first commercial service hydrogen-powered train in North America
  13. drum118

    GO Transit Electrification | Metrolinx

    True, but the UPX was to be done by 2019 and still nothing considering footings were placed in many locations as new things got built before 2019. Lakeshore East was to be done first that saw all the footing in place when the Whitby complex was built.
  14. drum118

    Toronto Nordic Condos | 40.3m | 12s | Collecdev-Markee | gh3

    March 29 Lot more u on my site
  15. drum118

    Toronto 908 St Clair West | 44.8m | 12s | Canderel | TACT Architecture

    March 29 More up on my site
  16. drum118

    Toronto Monza Condos | 36.28m | 10s | The Benvenuto Group | StudioAC

    March 29 Getting caught up on my backlog and more up on my site