    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    March 19, 2022 - Pool columns have been poured - Service connections for water and sanitary has begun on the southside of the building on Bremner Blvd (section of roadway will be closed until March 28th I believe)
  2. T

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    I'm a longtime lurker of UT but usually on the Transportation and Infrastructure subforums. However seeing that there is not a lot of top down shots of this project posted. I decided to contribute when possible.
  3. T

    Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)

    I found out about this forum early this year and I must say it's pretty satisfying to see all the finished work that the workers (myself included) have achieved throughout this project. Thanks everyone for the update posts.