  1. T

    Toronto Artistry Condos | 112.35m | 32s | Tribute | Graziani + Corazza

    Sorry to tell you but the grey pre-cast cost the same as the red. When we use real brick depending on the fabricator the grey usually cost more than the red.
  2. T

    Toronto 252 Church | 166.1m | 52s | CentreCourt | Arcadis

    That makes more sense, in our building the fees are around .85 per sq ft for units with parking. that includes the heat ,water ,garbage and most of the hydro cost.
  3. T

    Toronto The One | 308.6m | 85s | Tridel | Foster + Partners

    The Silva Cells allow for the soil to stay lightly compacted under the concrete, the planting bed will be considerable smaller then where they installed the Silva Cells.
  4. T

    Toronto The One | 308.6m | 85s | Tridel | Foster + Partners

    I believe the areas that they covered with asphalt are going to be planters as they installed Silva Cells in those areas.
  5. T

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    We live in a strange world... 😜Been doing it for a long time and have lived in many homes but at my age i prefer to live in the Sky...😁
  6. T

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    I build single family homes and we need city inspections for all elements except for electrical which is done by Ontario Hydro, some inspectors don't seem to know how to inspect complicated structural element and ask us to have the engineer inspect the work and to write a report, this takes...
  7. T

    Toronto The Gloucester on Yonge | 147.82m | 44s | Concord Adex | a—A

    Sorry to say but all builders have the same pipe issues, its more the fault of the trades then the developers. Great Gulf, Pemberton, Tridel, Concord, Menkes, and all other ones have these unfortunate issues.
  8. T

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    I believe they have built 17 floors in the last 29 weeks. Looks like they are now doing a floor a week lately.
  9. T

    Toronto Pinnacle Lakeside (Phase 1) | 174.86m | 54s | Pinnacle | Hariri Pontarini

    They have a conditional building permit which means they can build.