    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    July 24: Morning - setting up to pour the top layer of the ground floor slab in the north-east corner of King Toronto: Afternoon - freshly poured floor slab:
  2. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    July 24: North side of King Street - Some infill sections have been added into the steel framework on both the south and north side structures. Additional steel girders have been delivered and are staged on the ground - some have a slight curve to them - will be interesting to see how they are...
  3. A

    420 South Service Road East | ? | Rose Corporation |?|

    THE ROSE CORPORATION ACQUIRES LARGEST LAND PARCEL IN MIDTOWN OAKVILLE Jul 24, 2024, 14:15 ET The 27-acre, Former General Electric Site, Purchased by Rose for $45 million TORONTO, July 24, 2024 /CNW/ - The Rose Corporation, today announced the purchase of the 27.3 acre former General...
  4. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    July 23 - Some thoughts on UtakataNoAnnex's comment below, but first some photos. Major change at Portland Commons is that both the Front and Portland Street sidewalks have basically been cleared and are open for use. The Portland Street sidewalk is quite wide, and would accommodate a sidewalk...
  5. A

    Toronto 400 King West | 157.37m | 48s | Plaza | BDP Quadrangle

    First shipment of precast was actually delivered on July 11 - photo in post 453 above....
  6. A

    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    July 23 - Finished partitions between the individual unit balconies are now being installed. The partitions appear to be quite different from the normal balcony railing type partitions, but are full height, three dimensional triangular assemblies with what appear to be ventilation grills near...
  7. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    July 23 - three detail photos. Some sections of King Toronto have been topped off - can be seen in the formed concrete areas below, while other peaks are still rising. So overall, not completely topped off yet, but should be soon. Installation of the mechanical components, is proceeding. In...
  8. A

    Toronto 400 King West | 157.37m | 48s | Plaza | BDP Quadrangle

    July 21: 400 King West keeps on growing. On the east side, the next (and final) setback for the main tower footprint is now visible.
  9. A

    Toronto Maverick | 154.53m | 49s | Empire | Arcadis

    Monday afternoon, July 21. Very active crew working on the replacement sidewalk in front of Maverick, among other things, installing the formwork for the new concrete. Lot of supplies on site as well.
  10. A

    Toronto Ellie Condos | 105.76m | 31s | G Group | Kirkor

    Monday, July 22, late morning (11 AM). No activity on site. Sidewalks on three sides (south, east and north) look to be in an abandoned state of preparation. South side: East (Yonge street) side: North side:
  11. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    July 19. A lot, but by no means all, of the remedial glazing and cladding sections have been installed, however there are still a number of pieces still sitting around at the sidewalk level. Some overview photos, along with some more detailed ground level pictures. A couple of Front...
  12. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    July 19. A day of very impressive progress on the north side of Queen Street. This morning, the crew was working on the final, east-most section of the north wall steel girder structure (photos above). This afternoon, when we passed by around 4:30 PM, what looks to be almost the entire south...
  13. A

    Toronto 2444 Yonge Street | 114.27m | 31s | First Capital | Hariri Pontarini

    July 19 - Crane is up. Driving by so no photo unfortunately. @interchange42
  14. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    July 18 and 19. Installation of the steel girders on the north side moving quickly. South side of King Street:
  15. A

    Toronto 400 King West | 157.37m | 48s | Plaza | BDP Quadrangle

    From yesterday afternoon, July 18. The tower is taking shape - its form can be seen clearly now. Overall, this project appears to be moving very quickly.
  16. A

    Streetcar Tracks on Adelaide

    From July 18 - ongiong work at Queen and York Streets intersection. Sleeping sleepers: Track rails waiting installation:
  17. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    From July 18. Some portions of King Toronto now appear to be topped off.
  18. A

    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    Thursday afternoon, July 18 - Biggest visible change would be the enclosing of the south portion of the mechanical penthouse.
  19. A

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    July 18 - Thursday afternoon:
  20. A

    Toronto Maverick | 154.53m | 49s | Empire | Arcadis

    King Street sidewalk work continuing.

Back