    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    July 12 Evening: Still somewhat doubtful about the anticipated late this year for planned residential occupancy, looks like there is still much to be completed, unless lower portions of the buildings are completely self-contained with all necessary building operations and life-safety systems...
  2. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    July 12 Evening - from Wellington and Portland. West mountain is still going up.
  3. A

    Toronto 543 Richmond Street West | 47.24m | 15s | Pemberton | BDP Quadrangle

    The building was only ugly as when 555 Richmond was built, the post and beam warehouse was reclad to mirror 555 building exterior. Inside, the post and beam building was quite spectacular, with an atrium, and a number of open facing offices. Except for the basement, which housed an underground...
  4. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    August 12 - Five roof trusses now up on the north side of King Street temporary structure. Lots of overhead work going on today.
  5. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    August 12: Front Street sidewalk Portland Street sidewalk Still missing some cladding sections. And not sure about the terrace door surrounds - detailed photo of one of the terrace doors below. Nice terrace facing Portland Street and Victoria Memorial Square Still not sure...
  6. A

    Barrie 535 Bayfield Street | 17.2m | 5s | Petrogold | KLMA

    List of Homonyms, Homophones, and Homographs Here is a list of some of the most common homonyms, homophones, and homographs. The first column contains homonyms in alphabetical order, while the second and third columns list the corresponding homonym, homophone, or homograph, as applicable...
  7. A

    Pickering Lastman’s Bad Boy Distribution Centre | 12.19m | 1s | Lastman's Bad Boy

    The company is gone now though? I guess SmartCentres will need to find a new tenant. 1. SmartCentres owns the building - SmartCentres was the original developer on behalf of their signed tenant Bad Boy. 2. My understanding - at the SmartCentres first quarter results conference call in...
  8. A

    Toronto 400 King West | 157.37m | 48s | Plaza | BDP Quadrangle

    Cladding installed to date on the north side of 400 King West: And the view from Charlotte Street:
  9. A

    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    August 7 - The Bathurst Street sidewalk area has been cleaned up a lot, much of the building material being staged there and associated equipment has been removed.
  10. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    August 7 - Clifford Heritage Restorations on site today, along with a shiny new piece of their equipment. Normally one might not expect them back until time to work on the restored facades, closer to completion, but... Apparently, some of their stabilizing framework on the south side front...
  11. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    August 7 - From a bit higher up:
  12. A

    Toronto Maverick | 154.53m | 49s | Empire | Arcadis

    August 7 - A long time coming, but the sidewalk in front of Maverick is finally getting close to the finish line. Concrete is complete, the decorative stone section along the street edge is in progress, and the landscape contractor is preparing the sidewalk planters.
  13. A

    Toronto 400 King West | 157.37m | 48s | Plaza | BDP Quadrangle

    August 7 - 400 King West is definitely moving quickly.
  14. A

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    TTC drivers about to start their training will take drivers out of their regular cycles - some backfill required. Walking along King between Spadina and Portland around midday today, three streetcars went by with operators on training runs.
  15. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    August 6 - Two more trusses assembled with additional components stacked on site for assembly.
  16. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    August 6 - West Mountain has at least one more floor to go.
  17. A

    General railway discussions

    This is going back a long way - CP was trying to get out of its passenger services even before VIA was established - CP abandoned its Montreal / Toronto passenger service leaving the field to CN I believe in the 1960's. CN at the time increased its service as a consequence, publicly announcing...
  18. A

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    July 2 - The steel girder framework for the mechanical penthouse areas on top of the taller tower was installed this week - went very quickly.
  19. A

    Toronto 422 Wellington West | 14.33m | 2s | Allied | ERA Architects

    August 2 - Evening, and the exterior lighting is on. Also, the asphalt has been lifted from the areas behind this and the Le Select building in preparation for resurfacing - outdoor patio and landscaping areas.
  20. A

    GO Transit Fleet Equipment and other

    July 31 - On a different note - seen outside the Whitby GO Transit Maintenance Facility today: