Here are some pictures from yesterday and today. The 65th floor looks like it's almost ready to get poured. The forms and electrical conduits have been installed. I can't see the concrete nozzle at the top anymore from my level :(
The top crane brace is secured to the floor of level 60, as per the markings on the wall. It's hard to say for sure if the last floor poured is 64 or 65. What does everyone think?
From today, they added a crane support at level 60. In fact, they are still working on it as of 8pm this evening. Benito's pictures show a section of crane being hoisted and most likely that was inserted too.