Search results

  1. R

    Toronto The HUB | 258.46m | 59s | Oxford Properties | Rogers Stirk Harbour

    It is an elevation for a site plan approval which doesn't concern interior design, not a render. The core is not going to be monolithic grey, they just wouldn't show the stone in this type of drawing, or lighting, or any other details really. The green is used to contrast where the glass is and...
  2. R

    Toronto The HUB | 258.46m | 59s | Oxford Properties | Rogers Stirk Harbour

    Telus' lease is up, Rogers just sold their office on the North side of Bloor, RBC is in 5 different towers, Bell has no major downtown presence .. I think it could be any of these unless you have intel on Rogers moving elsewhere.
  3. R

    Toronto The HUB | 258.46m | 59s | Oxford Properties | Rogers Stirk Harbour

    Or RBC or Bell or Telus or Rogers I mean ... not really worth it to speculate ...
  4. R

    Toronto The HUB | 258.46m | 59s | Oxford Properties | Rogers Stirk Harbour

    This is 100% why. They dont want to have the exterior look like Google. Every anchor is going to want signage on that wall on Bay Street.
  5. R

    Toronto Park Hyatt Renovation | 62.48m | 18s | Oxford Properties | KPMB

    Yikes they are way behind ... glazing was supposed to be done by December.
  6. R

    Toronto The HUB | 258.46m | 59s | Oxford Properties | Rogers Stirk Harbour

    Interestingly Roger's just out 350 bloor east on the block
  7. R

    Toronto The HUB | 258.46m | 59s | Oxford Properties | Rogers Stirk Harbour

    Generic industry knowledge of office development economics. Nothing specific except that a. Oxford hasn't ever gone spec and b. This is a very expensive tower given the spec and the rates are likely well above CIBC Square meaning not many tenants who could afford it ...
  8. R

    Toronto The HUB | 258.46m | 59s | Oxford Properties | Rogers Stirk Harbour

    KPMG in its own tower, EY in EY Tower, PWC in a new tower, Deloitte in a new tower. Maybe Roger's or Bell ...
  9. R

    Toronto The HUB | 258.46m | 59s | Oxford Properties | Rogers Stirk Harbour

    They've screwed themselves on this. There are no anchor tenants, maybe except RBC, who need a new office and could pay for this. They arent going to kick this off without at least a 40% lease ...
  10. R

    Toronto Park Hyatt Renovation | 62.48m | 18s | Oxford Properties | KPMB

    They originally requested that and it was supported by Crrssy but Tory shut it down at council because he was on a no lane closure kick. They have a full time cop on the corner managing pedestrians at a way higher cost than closing the lane.
  11. R

    Best Toronto Midrise architects?

    Code wise, yes. Exposed mass timber wont work cost wise.
  12. R

    Best Toronto Midrise architects?

    I saw Icon and thought they were interesting too. As an aside, I did do a conceptual massing and the setbacks are killing my economics. I need all the density I can get to make mid-rise work, and the setbacks required by the midrise guidelines are both reducing density, and shooting my formwork...
  13. R

    Best Toronto Midrise architects?

    @ProjectEnd @interchange42 @AlvinofDiaspar @Automation Gallery Any thoughts?
  14. R

    Best Toronto Midrise architects?

    Hi - working on a project on the side. An 50-60 unit rental apartment downtown; 5 storeys, likely. Mid-end. My mental benchmark is the Mod'n in Burlington. Maybe some towns if economics permit. This isn't quite "missing middle" but there isn't a lot of experience in this realm and my experience...
  15. R

    Toronto Union Park | 303.26m | 58s | Oxford Properties | Pelli Clarke Pelli

    I hear you. I agree. 1 year demo (12 months) 12 weeks for each below grade level (so 12 months) 4 weeks for each podium level (6 months) 3 weeks for each typical office level (42 months)
  16. R

    Toronto Union Park | 303.26m | 58s | Oxford Properties | Pelli Clarke Pelli

    Construction timeline is at least 6 years ... must have misspoken at the event. All of their other comms are 2029.
  17. R

    Toronto Park Hyatt Renovation | 62.48m | 18s | Oxford Properties | KPMB

    Welding gas tank exploded in the basement.