News   Sep 10, 2024
 543     0 
News   Sep 10, 2024
 497     0 
News   Sep 10, 2024
 1.4K     0 

Search results

  1. R

    Toronto Park Road | 99.3m | 27s | Capital Developments | Diamond Schmitt

    This is interesting. The developer was planning to connect the park by closing Collier Street. Looks like this might be happening.
  2. R

    Toronto 170 Roehampton | 160.84m | 50s | Capital Developments | Sweeny &Co

    I am assuming that the Daycare was supposed to be a Section 37 and the City could not figure out a way to do that.
  3. R

    Toronto 15-17 Elm | 99m | 30s | Fora | PARTISANS

    I like this building, but the block plan is fishy. They are basically saying the east assembly along Yonge should be A-OK with a 500 SM plate and provide the required 25M setback so that they can provide 0M.
  4. R

    Toronto 399 Yonge | 252.3m | 75s | Capital Developments | Teeple Architects

    I look at this differently. this isnt part if a s37 and the city doesnt have power to ask for it so I assume this was how they got a deal with covenant. At 12 units a floor that's probably a $24 million revenue loss for the Developer.
  5. R

    Toronto 399 Yonge | 252.3m | 75s | Capital Developments | Teeple Architects

    Looks like the second and third floor are directly connected to Covenant House.
  6. R

    Toronto 399 Yonge | 252.3m | 75s | Capital Developments | Teeple Architects

    This thing might settle zoning on a 75 story tower in like 10 months. That has to be a record.
  7. R

    Toronto Park Road | 99.3m | 27s | Capital Developments | Diamond Schmitt

    I have heard from a colleague at CD that transportation is actually pushing back against the park connection against the wishes of the RA and Councillor. Good job City of Toronto.
  8. R

    Toronto 8 Elm | 218.2m | 69s | Reserve Properties | Arcadis

    As I understand, Mizrahi in-housed construction rather than paying CM fees.
  9. R

    Toronto 399 Yonge | 252.3m | 75s | Capital Developments | Teeple Architects

    I am "assuming" that this is lobbed in design knowing that it was going straight to OLT. We should just be pleased that at least it will be designed by Teeple and not IBI or Turner Fleisher. I'm an optimist maybe.
  10. R

    Toronto Alias | 160.52m | 48s | Madison Group | Teeple Architects

    I really really hope they don't Nobu this one...
  11. R

    Toronto 8 Elm | 218.2m | 69s | Reserve Properties | Arcadis

    This is what VT consultants like Soberman and KJA do. They should just target average wait times by building height and use and have to submit an engineering report. Elevator size, door close speed, whether it is centre or side door, etc. are all factors in their models. So is where is...
  12. R

    Toronto 8 Elm | 218.2m | 69s | Reserve Properties | Arcadis

    I walked past the site on Friday and there were numerous construction crews taking out the windows and doors, and removing furniture and some drywall from the site. Looks like maybe hazmat removal has started.
  13. R

    Toronto 170 Roehampton | 160.84m | 50s | Capital Developments | Sweeny &Co

    It's easier to blow away a 50 unit tower than blow away 3 single family homes to develop. End the yellow belt. It's stupid.
  14. R

    Toronto 15-17 Elm | 99m | 30s | Fora | PARTISANS

    You mean because there is no planning case and it's by a developer who has never built anything? I hear you.
  15. R

    Toronto 15-17 Elm | 99m | 30s | Fora | PARTISANS

    So no setbacks to any side .... I smell an OLT fight with the neighbors to the east.
  16. R

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    There is exactly no chance the tower is done by that date. It might be that they could occupy in phases but first tentative occupancy dates usually mean nothing.
  17. R

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Why are there zero people on site? Walked by today ...

Back
Top