News   Aug 23, 2024
 1.4K     0 
News   Aug 23, 2024
 2.3K     4 
News   Aug 23, 2024
 577     0 

Search results

  1. grammin

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Was at Sloane last week, chatted with a. worker who confirms the train the trainer program, things are going pretty well and just trying to iron out a few bugs for training and commissioning. Very good sign though to see Crosslinx and TTC employees working together. Make of that what you will...
  2. grammin

    Toronto Eaton Centre (Ongoing Renewal) | ?m | ?s | Cadillac Fairview | Zeidler

    Yea a bit later but Zaxxon was pretty groundbreaking stuff at the time.:)
  3. grammin

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    From the waterfront today
  4. grammin

    Toronto 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    Some shots from CIBC Rail Deck Park
  5. grammin

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    I'm fascinated by the engineering here. Cool stuff!
  6. grammin

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Now that it's all out the ground, this part of the building really has some heft to it. You really feel it driving east on the Lake Shore. Stark contrast to The One.
  7. grammin

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Was out and about last week. I could just see the construction from Harbord and St George looking East. If you really look you can see it!
  8. grammin

    Sheppard Line 4 Subway Extension (Proposed)

    I apologize, I was just trying to be light hearted but I respect the seriousness of the conversation and admit in hindsight my post placement was pretty random and not reflective of the conversation.
  9. grammin

    Sheppard Line 4 Subway Extension (Proposed)

    Wow, I didn't realize Kipling Station on Line 2 was so far west, I also realize that these are not scale but them-there-that's taking liberties y'all no?? :cool:
  10. grammin

    Toronto Ontario Line 3 | ?m | ?s

    Is this for the King St Streetcar extension as well or just the Queens Key West extension? Hopefully once they see how many cars are headed into that area next summer when the parks open, they'll change their mind.
  11. grammin

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Hi Dan, interesting stuff, can you say how much TTC has been involved to date in the commissioning and operational readiness of the line? In projects I have worked on in oil and gas, our final operator was involved at every stage of design/ engineering/ commissioning and control long prior to...
  12. grammin

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Imagine all the exciting positive meetings currently going on at Metrolinx HQ these days. I kid, I kid!😶
  13. grammin

    Toronto Ontario Line 3 | ?m | ?s

    Was at exhibition yesterday, sorry no pics, but tonnes going on there and they are building a steel pedestrian bridge over the rails. About 30% complete I'd say. Full height on the south side. I'm guessing it will be enclosed. Hard to see what else is happening from ground level.
  14. grammin

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Nice stuff. First pic, Eglinton or Cedarvale?
  15. grammin

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I watched parts of the Metrolinx Directors meeting on YouTube. Without adding to conspiracies, the Manager who presented Crosstown was being careful with his wording around Construction vs Commissioning with regards to levels of completion and timing. When asked for a specific date, they did not...
  16. grammin

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Hi, latest video uploaded to YouTube on future streetcar, to Villiers Island from Distillery District. Hope you enjoy it.
  17. grammin

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    @Broncos7 Great pics above, definitely good news to see the excavations at Eglinton being covered over. Won't take long to repave after that!

Back
Top