News   Aug 23, 2024
 1.3K     0 
News   Aug 23, 2024
 2.1K     4 
News   Aug 23, 2024
 560     0 

Search results

  1. N

    Montréal Transit Developments

    https://www.cbc.ca/amp/1.6753495 STM and the mall owner at the future Anjou Station have reached a deal for using part of the mall parking lot for the station. The STM will recieve the land in March 2024.
  2. N

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    According to the emails in the article, testing is not the reason. The article says the real reason was not stated. But if it's not testing, then it is probably construction on stations like Eglinton-Yonge etc.
  3. N

    Montréal Transit Developments

    New shots for the Gare Centrale REM https://www.facebook.com/REMgrandmtl/posts/pfbid0FvhdnGeJF1uBtsZ7KtbozXfSAifCEBLb2x6rKVathVuQdT4Dg5yzWerApiJcXkozl
  4. N

    Toronto Ontario Line 3 | ?m | ?s

    Opinion piece about the trees situation. https://www.tvo.org/article/what-osgoode-halls-trees-tell-us-about-the-future-of-progressive-politics?fbclid=IwAR1B4j0jAGuWXZrcDmaNRQUQ2EVPyErUceYTL0HYJBI9DyFzvizT0LAs8Uo
  5. N

    Montréal Transit Developments

    Glad to help. And congrats on becoming an "active member". 15 years is a long time! When I read it they made it sound like 'the whole project [minus the airport] should be done by end of 2024, including this station'. pre-Covid they had said this station will open in 2023. So hopefully this...
  6. N

    Montréal Transit Developments

    What information are you missing? https://rem.info/en/news/griffintown-bernard-landry-station-unveiled The station is targeted to open by end of 2024 along with the other branches.
  7. N

    Montréal Transit Developments

    Progress photos posted on the FB page for the REM. https://www.facebook.com/REMgrandmtl/posts/pfbid0qV9bA4tUBP9sdN9qEqwMEugKQYVCT9832KDjArsNDWPEShCniXG6UB2NmHQwe3MAl
  8. N

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I dont have any documents off the top of my head. But Montreal decided to move away from bi-directional cycle tracks because they are less safe than having one on each side of the road. So you give access to emergency vehicles but then you risk having more bike-car crashes.
  9. N

    Toronto Ontario Line 3 | ?m | ?s

    There is room at the NE corner of Osgoode and Queen. The detailed locations of the stations are built by engineers. Pretending that the details are a stroke of some politician's ego ignores the reality of building infrastructure. Do you blame Tory for the model of urinals in Toronto parks? Do...
  10. N

    Toronto Ontario Line 3 | ?m | ?s

    Osgood Hall's greenspace is enclosed with metal bars with spikes with gates that look closed. I have been living in the GTA for a decade and only after the OL did I realize that this space is actually open to the public. I wonder how many people walking by had the same impression seeing how it's...
  11. N

    Toronto Ontario Line 3 | ?m | ?s

    Good catch I find it hilarious that the court documents show that the trees on site were planted a decade after discussions on the Queen Subway started. (granddaddy plan of the OL) These are not 200yo magical trees. They are not more special than the trees planted after the Yonge Subway cut...
  12. N

    Toronto Ontario Line 3 | ?m | ?s

    I had no position in that post. I simply conjured the ultimate end to people's arguments. We can shift the station North, South, East, West, Horizontally, or Vertically. In the end, the station will impact something of value to someone in the city. This is a dense center of a 230yo city and this...
  13. N

    Toronto Ontario Line 3 | ?m | ?s

    I have an 𝒾𝒹𝑒𝒶™ How about we cancel the Osgoode OL station? There is already a subway station there. No need for duplication. The OL will connect to Line 1 about 600m east of there. Will save the 5 trees! It will also reduce potential NIMBY delays. Everyone wins!
  14. N

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Reading how we got to this point would make you laugh and cry. The SRT is crumbling because the City could not decide on how they want to rehabilitate the SRT a project that was gimped by political fighting. But it didn't need to be this way. The Vancouver Skytrain and the SRT are the same tech...
  15. N

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    You can look up the term 'premetro'. The Crosstown can be considered one if you squint hard. But it wasn't built with conversion to high floor in mind. So grade-separating the surface section, if that ever happens, will be low floor probably. Compared to today. But that is not relevant. They...
  16. N

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I find it amusing that people pretend the city never replaced lines before. Lines 1 and 2 used to be streetcars. Eglinton and Finch are being switched from busses. The TTC and city council botched the Scarborough RT Mark II upgrades which got the SRT switched to Subway TRs in a tunnel. The...
  17. N

    Waterfront Transit Reset Phase 1 Study

    We live in Toronto where pipes and winter both have existed for centuries. I'm sure they will know to maintain it in winter. 😑
  18. N

    Montréal Transit Developments

    Further, it says a preliminary report on the changes will be out at the end of the week and a final one in June. According to La Presse CDPQ Infra is still working on plans for REM extensions to Boucherville, Laval and Lanaudière.

Back
Top