  1. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    Thread, for those unaware and interested. tl;dr progress crawled, then the developer went belly up.
  2. DonValleyRainbow

    Toronto 327 Royal York Road | 118.5m | 35s | VANDYK | SvN

    X-post from a GO thread:
  3. DonValleyRainbow

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    It's about a 4 hectare area with a depth of at least 6 metres, add a metre for the dockwall elevation. That's 280,000 m3, or only 40% of what's being excavated (690,000 m3), so point taken.
  4. DonValleyRainbow

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    The Portlands are massive.
  5. DonValleyRainbow

    GO Transit: Service thread (including extensions)

    There was that time the Harper Government changed them in their federal budget.
  6. DonValleyRainbow

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Give me different coloured glass and I'll be down for this latest iteration.
  7. DonValleyRainbow

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Makes you wonder why we require developers to allocate a minimum number of parking spaces.
  8. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    Yeah don't rely on Wikipedia. The rail services pages is pretty good for the rail network history, but ideally you gotta learn the subdivisions and look up the timetables. Rails in Toronto isn't too bad.
  9. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    I believe GO trains can hit 90 mph between Lisgar and Milton. The thing to point out here is that's a rare case; trains barely reach that echelon of speed before they have to slow down for the next station, a track switch, or general traffic ahead. The only beneficiary of high speeds on the...
  10. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    Ownership was likely a factor too, service was launched in Dec 2011, Mx took ownership in Sept 2014. Hear hear. How the hell is there no direct KW-Guelph service, even for buses? But the speed is atrocious. The schedule allows 24 minutes between Kitchener and Guelph (avg. speed ~ 55 km/h)...
  11. DonValleyRainbow

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I second that you should ask to meet with Metrolinx about this, I'm sure it would be a huge help to you as a deafie after all!
  12. DonValleyRainbow

    Toronto 8 Elm | 218.2m | 69s | Reserve Properties | Arcadis

    This literally looks like a Ctrl+C / Ctrl+V job, it's the original with an addition tacked on. Let's see some curves or something, damnit!
  13. DonValleyRainbow

    Toronto 8 Elm | 218.2m | 69s | Reserve Properties | Arcadis

    Yay, it's not a beanpole! Which should be default for any development within 5 minutes of a subway stop.
  14. DonValleyRainbow

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    Does someone want to start a Google sheet?
  15. DonValleyRainbow

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    I can't believe how much fill there is still. If it's being taken to the Port Lands for infilling, it makes you wonder if it would have been more efficient to load it via conveyor belts, over Front Street, and into rail cars along the northernmost track of Bathurst Yard.
  16. DonValleyRainbow

    Toronto Maple House at Canary Landing | 89.61m | 26s | Dream | COBE Architects

    I'm really liking the architecture, particularly for Towers A/B. Way to break the mould of blue glass and spandrel!
  17. DonValleyRainbow

    GO Transit: Service thread (including extensions)

    "Prochain arrêt" (en francais).
  18. DonValleyRainbow

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    Isn't that what caused a power failure on the 510, and all intersecting east-west routes in the vicinity a while back?
  19. DonValleyRainbow

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    I think increased voltage is a potential future improvement, but not one that can be explored until the fleet and the network is fully converted, and not something the TTC has publicly mused about yet.