News   Aug 06, 2024
 397     0 
News   Aug 02, 2024
 2.7K     1 
News   Aug 02, 2024
 4.7K     3 

Search results

  1. DonValleyRainbow

    Toronto Union Centre | 298m | 54s | Westbank | Bjarke Ingels Group

    I can't believe the impact this would have on the skyline. Dat width. Dunno if it's a good or bad thing, just saying it really sticks out relative to its neighbours looking at it from the north or south.
  2. DonValleyRainbow

    Toronto Crosstown LRT: Mount Dennis Station and EMSF | ?m | 3s | Metrolinx | IBI Group

    It's amazing, it's like this transit project (at least this part) will be done on time!
  3. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    Sounds like 2+2 to me, there's no need for a 5th track (aka a CN service track). The current tunnel is pretty tight for 3 tracks.
  4. DonValleyRainbow

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    I hope they get a solution soon too, cause if not, I foresee a class action. What an unfortunate fail for Bazis, and inhumane treatment for residents.
  5. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    FYI, since this is the third time I had to look it up: Nickle is the interlocking between Ray Ave (Mt Dennis) and Jane Street.
  6. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    UT elders know very well this is because the corridor was never fully completed in multiple spots; full buildout calls for 2 tracks dedicated for each line/service where it uses the corridor (2 Kitchener, + 2 UPX east of the 427, + 2 Milton south of Dupont, + 2 Barrie east of Lansdowne). For...
  7. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    Mostly agreed. While I don't think a stop was warranted, Tier 4 trains were a reasonable demand, and the tunnel to maintain access was essential to ensure the already segregated community wasn't further severed.
  8. DonValleyRainbow

    Waterfront Transit Reset Phase 1 Study

    Sidewalk Labs could pull out of Quayside project if transit isn’t built, CEO says
  9. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    Accountability is big, but consultation can add value too. A good example is accessibility. Having public input can prevent a station design that is not convenient or a hindrance for those living with a disability. I know us on UT like to grind the axe with NIMBY types, but there are many cases...
  10. DonValleyRainbow

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    How much will Transitway ridership increase when the Crosstown is completed to Mt Dennis? When/if it is extended to Renforth? If they don't start the extension construction before Crosstown opens, prepare for lots of lamenting about 'the gap.'
  11. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    I thought about that, but why wouldn't those EB passengers just take the LRT to the airport that comes every 5 minutes vs the UPX that comes every 15?
  12. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    I can see the case for this not being a UPX stop considering that the Finch West LRT would be extended to the airport. The LRT serves the purpose, therefore no one would ride it, and it would be a time cost to everyone else. After all, that plus adding a stop at Mount Dennis would make this far...
  13. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    Was about to jump in on the platform piece. It would replace a track that used to be there. I would also add that the runthrough track and Silver seem to be far from mainline speeds. See my post from the service thread:
  14. DonValleyRainbow

    407 Rail Freight Bypass/The Missing Link

    Those people don't understand where people live in Mississauga.
  15. DonValleyRainbow

    407 Rail Freight Bypass/The Missing Link

    I'm sorry everyone, I'm a tool and didn't clarify that this comment was in respect to the Milton line.
  16. DonValleyRainbow

    407 Rail Freight Bypass/The Missing Link

    The archilles heel of the bypass (in its original form, with both CN and CP using it) was that east of Halwest, CN would need to share that routing with CP to get them to their Mactier and Belleville subdivisions. The only reason it was logjammed, and subsequently settled to be a CN-only...
  17. DonValleyRainbow

    GO Transit: Construction Projects (Metrolinx, various)

    I believe a layover was, at some point in time, planned immediately west of Mt Pleasant GO. There's still a switch and unactivated signal on the south track. I think something happened, perhaps it was not accommodated in the development plans or the extension/grade separation of Creditview Road?
  18. DonValleyRainbow

    Toronto Sidewalk Toronto at Quayside | ?m | ?s | Sidewalk | Snøhetta

    Looks like they're still proposing to split Queens Quay at the Parliament Slip.

Back
Top