Thanks! I emphasized connectivity by designing a smaller number of large hubs than a large number of small hubs, to minimize the much dreaded transfers. I avoided alienating the suburbs by giving them their fair share of BRT lines, feeding into the LRT, subways, and GO.
I'm thinking of adding...