News   Jul 26, 2024
 915     0 
News   Jul 26, 2024
 2.4K     2 
News   Jul 26, 2024
 2.2K     3 

Search results

  1. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Ah ok. So the default is just a normal shower/bathtub where you would use a shower rod & shower curtain and the upgrade is a full sliding shower door. Based on my experience with the partial glass panel in an apartment I once rented, a shower curtain is going to work better anyway. Thanks for...
  2. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Thanks for the update Joyce. Don’t worry about pictures, you needed to focus on the inspection. That’s very annoying about the power cut during the inspection. It’s pretty hard to inspect things in semi-darkness! I hope you at least got shown the breaker panel & the water shutoff valves. I’m...
  3. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Let‘s hope the interim occupancy period is short.
  4. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Personally I’m surprised that easy things like doing grout and caulking were missing or done improperly. I was also surprised at the number of dings and dents in the walls that were noted in our PDI. All of these were noted down by the builder rep before we even got there. It looked like they...
  5. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Our unit is on the 7th floor. We just got word from the builder yesterday that our occupancy date is now Feb 8 but the builder hasn’t contacted our lawyer yet. I agree that $4500 is a lot and I’d hope that the builder would provide a breakdown in the papers going to the lawyer since there seems...
  6. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Yes, doesn’t look too sturdy. We got the island with the storage cabinet underneath which might provide some support but only on the one side.
  7. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Thanks Antonius. We also found that the sliding shower door in the ensuite was missing. It looked like they had started to install & stopped. There was a box with the sliding door in the main bedroom waiting to be installed. I’m curious - did you choose the upgraded island or the standard...
  8. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Thanks. Lobby still not ready, I guess.
  9. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    You’re welcome Antonius. It’ll be interesting to hear your impressions of the state of the main entrance since it was kind of a mess when we had our PDI. I’m wondering how much progress they’ve made in the past few weeks.
  10. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Glad to hear that Joyce. I think they may have been holding off on PDIs for the ground floor because of all the comings and goings of the workers on that floor and all the work still going on inside the main entrance. But at least we can see the light at the end of the tunnel. Happy Holidays.
  11. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Thanks Joyce. I imagine you’ll hear soon. But the builder is still saying ”several weeks” later for new occupancy dates and we don’t know what their schedule will be like over the holidays. So your guess is as good as mine as to when we will move in.
  12. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Had our PDI yesterday (Building A, floor 7). As expected, work is still incomplete all around the site. We were brought in the main entrance on Saigon Drive. You are required to wear hard hat & steel toed shoes (provided by the builder). The common areas are completely unfinished. The concierge...
  13. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Thanks for the update Joyce. At this rate, it will be spring.
  14. D

    NEXT at Elgin East (Sequoia Grove Homes) - Real Estate

    Hi Joyce. Up until Nov 13 our occupancy date was Nov 28. Then on Nov 13 we got an email from the builder saying that our occupancy was delayed due to unforeseen circumstances beyond their control. They went on to say ”We will be in touch within coming weeks with more information regarding your...
  15. D

    Richmond Hill NEXT at Elgin East | ?m | 10s | Sequoia Grove Homes | BDP Quadrangle

    Photo taken Sunday Nov 19 looking at the west end of Building B. Windows look done. Still finishing work required on north side. Note the 2 mobile cranes with workers installing finishing panels - cranes completely blocking David Eyer Drive. I’ve been to the site many times lately and...

Back
Top