News   Jul 22, 2024
 268     0 
News   Jul 22, 2024
 1.1K     0 
News   Jul 22, 2024
 545     0 

Search results

  1. A

    GO Transit Electrification | Metrolinx

    Given the April 19, 2022 date for signing of the contract with the consortium for the Go Transit project, including the electrification components, and given that it is now coming to the end of the two year development phase, perhaps it will soon be time to upgrade the Go Transit...
  2. A

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Yes, it is fixable. There are at least three more sets of escalators under construction, and are actually clearly visible when looking at the areas which are not yet open. One set is at the east end of the food court, by the health centre (lower ground to ground levels), one set is at the west...
  3. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    April 4 - Working on the West Mountain this morning:
  4. A

    Toronto 2010 Yonge | 59.8m | 14s | Sud Group | Graziani + Corazza

    April 3 - Activity on site - ground sample drill rig working away.
  5. A

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    My mistake - I had thought that Reliance was the forming contractor. Did not realize they were GC for the project. My understanding, from staff on site at Central, was that Concord was their own GC on that project.
  6. A

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    Some background from my perspective. When Concord Adex came to Toronto and started the CityPlace development they hired professional general contractors. The initial buildings on Front Street, the Matrix (361 and 373 Front Street) and Apex (381 and 397 Front Street) were built by Toddglen...
  7. A

    Vaughan Bravo, Encore at Bravo | 148.85m | 45s | Menkes | Turner Fleischer

    I gather this news release should have been posted in this thread: DEVELOPERS BREAK GROUND AT BRAVO, THE NEXT PHASE OF FESTIVAL IN VAUGHAN METROPOLITAN CENTRE MENKES AND QUADREAL START CONSTRUCTION ON THE NEXT PHASE OF THE LARGEST MIXED-USE DEVELOPMENT IN VMC Menkes Developments Ltd...
  8. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    A second shoring rig (the green unit) has arrived at the main station entrance site on the south side of King Street. While set up activities are continuing on the south side of King, drilling has actually started on the north side site. And on the north side:
  9. A

    Burlington Paradigm Condominiums (Burlington) | ?m | 18s | Molinaro Group | Graziani + Corazza

    Nominate the Home Depot in Oakville, right across the road (Cross Ave) from the Oakville Go station. Not sure when it was built - it was a number of years ago - but when I saw it going up, I was so appalled that I called the Oakville Planning department to find out how it could happen...
  10. A

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    There were three different developers for the residential buildings in The Well - Woodbourne Capital, RioCan Living, and Tridel. Tridel itself has two different types of building - their Classic Suites (their two buildings on Front Street) and their Signature Series building (the one on the...
  11. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    March 29: Interesting progress. Templates to facilitate locating the shoring drill hole locations have been installed both sites, north and south of King Street (south side still in progress). The location of the 15 metre in diameter shaft on the north side of King Street can be seen clearly...
  12. A

    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    March 29:
  13. A

    Toronto Artists' Alley | 121.91m | 39s | Lanterra | Hariri Pontarini

    March 29 - From King and Bathurst:
  14. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    March 29 - From the west: And a bit closer:
  15. A

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    March 28 - This evening:
  16. A

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    March 28 - This evening:
  17. A

    Toronto 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    March 28 - Hopefully TD Terrace will be a bit faster about fixing non-working LED sections than Aura's property management and Boards.
  18. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    March 28 Golden Hour: l
  19. A

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    March 28: Panorama photo of The Well, and a detail of the west side of the Tridel Signature condominium building, cladding, except for the glazing, is now almost all in place - still needs work on the podium levels.

Back
Top