News   Jul 17, 2024
 535     0 
News   Jul 17, 2024
 1.5K     2 
News   Jul 17, 2024
 634     0 

Search results

  1. M

    Toronto Yonge Sheppard Centre Renovations and Expansion | 123.13m | 35s | RioCan | BDP Quadrangle

    The signs are facing different directions, and are intended for different viewers. The upper sign is meant to be seen from the street and across Yonge. The lower sign is meant for people already on the east side of Yonge, who might not be able to see the upper sign, such as those coming out of...
  2. M

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Oh, I see. I've noticed that some of the shops have changed over from time to time. I'm glad Allwyn's seems to be doing well.
  3. M

    Toronto Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    I don't see a lot of talk about the food court in this building, unlike the forum for the Sheppard Centre, which is filled with conversation about Potatopia and which places are opening/closing. The food court at Emerald Park is great is terms of quality offerings! The seating is total shit, but...
  4. M

    Toronto Yonge Sheppard Centre Renovations and Expansion | 123.13m | 35s | RioCan | BDP Quadrangle

    Used to work at five guys. They do training for new employees for a few days before they open...
  5. M

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Toronto never misses an opportunity to be bland...
  6. M

    Toronto Yonge Sheppard Centre Renovations and Expansion | 123.13m | 35s | RioCan | BDP Quadrangle

    Does anyone know when the north door to the foodcourt from Greenfield will be open? It looks like the entrance is done, and just needs the sidewalk to be poured leading up to it.
  7. M

    Toronto Yonge Sheppard Centre Renovations and Expansion | 123.13m | 35s | RioCan | BDP Quadrangle

    I work at a school across the street, and have been wondering about what the layout and vendors would be. Thanks!

Back
Top