    GO Transit: Construction Projects (Metrolinx, various)

    Does anyone have any updates on some of the lesser-known GO transit rail expansion projects? For example: -Don Yard (to be completed Dec 2018) -Weston Sub 4th track from 427 to Nickel -Stations (Exhibition, Oriole, Maple, Bramalea, etc) -Bloomington extension
  2. K

    Toronto Spadina Subway Extension Emergency Exits | ?m | 1s | TTC | IBI Group

    Does anyone know the status of the Wilson Yard expansion? I seem to recall that it was intended to open in September 2018, but I have not heard anything about it. Has the TTC started using the new connecting track to Sheppard West?
  3. K

    TTC: Other Items (catch all)

    Not sure what having ATC has to do with the debate. ATC is not a requirement of platform edge doors. One need only to ride the UP Express, which has two stations with PEDs. Numerous other places in the world have them without automated trains.
  4. K

    TTC surface stop spacing

    Is there any indication why some of these are "on hold"? For example, the ones at Dundas/Chestnut were included in that Board report, but there did not appear to be any councillor objection.
  5. K

    TTC: Other Items (catch all)

    Does anyone have an update on the status of the third storage track at Kipling? I have not been out there in a while.
  6. K

    TTC surface stop spacing

    Is there a document that describes all the streetcar (and bus) stop removals across the system? I checked recent Board meetings and didn't see anything. Is this the extent of the removals at this time?
  7. K

    GO Transit: Service thread (including extensions)

    I didn't realize that UPX and the GO Kitchener line didn't share tracks (though the UPX does have to cross the Kitchener line so must share some portions of tracks).
  8. K

    Toronto Spadina Subway Extension Emergency Exits | ?m | 1s | TTC | IBI Group

    Does anyone know if the Wilson Yard expansion is now complete? I believe it was planned to be complete in January 2018.
  9. K

    GO Transit: Construction Projects (Metrolinx, various)

    Can anyone confirm exactly which GO Transit track expansion projects are currently under construction or about to start construction. My understanding is as follows: Stouffville Line: -Phase 1 (Marilyn to Steeles) 2nd track U/C -Phase 2 (South of Marilyn) 2nd track about to commence -Steeles...
  10. K

    Toronto Spadina Subway Extension Emergency Exits | ?m | 1s | TTC | IBI Group

    There is this one http://carto.metro.free.fr/metro-tram-toronto/ which shows the track and station details of the Line 1 extension. The author has indicated that it will be updated shortly to show the changes in 2017 as well as numerous other additions and corrections.