  1. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    The sales centre has now been loaded onto trucks, ready to take it away. Digging can't be that far away.
  2. K

    Toronto X2 Condominiums | 160.93m | 49s | Lifetime | Wallman Architects

    More office furniture is being removed from the building today.
  3. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    Cladding is almost complete on the 7th floor. They are pouring the supports and floor of the 19th floor. It's really looking great so far.
  4. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    Looking at the floor numbers on the construction elevator off Jarvis (floors 7 and 8 are the only ones numbered), it appears that they are considering the double sized lobby to be floors 1 and 2. The first cladded section to be floor 3, and the recently cladded third level to be floor 4. Don't...
  5. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    It looks like the cladding for the entire third floor will be mostly completed by the end of today.
  6. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    The cladding installation has begun on the south east corner of the building.
  7. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    There has been a lot of deliveries to the site today. It appears to be cladding related materials. The south east corner on the second floor has also been prepped for cladding.
  8. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    The forms are being moved up to start the 10th floor, and the construction elevator car has arrived.
  9. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    It looks like they have started to build the construction elevator on the east side facing Jarvis.
  10. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    ^^ I'm pretty sure that it's all residential - no retail here.
  11. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    The floor for the first level of residences was started to be poured today. About half of the floor was poured.
  12. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    Pouring a lot of flooring today, including the second level for the second elevator. Looks like they are trying to get as much done today as possible before the weekend.
  13. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    Today there are about 20 people working, plus the two crane operators.
  14. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    Great update guys. Thanks for the pics.
  15. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    ^^ On the 1/3 that is almost complete, they've started pouring 2 of the supports, plus the elevator shaft for the second level.
  16. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    They progressing quite well. Today they have started pouring the supports on the second floor.
  17. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    ^^ Thanks !! I can make them out now. I thought those seemed a little small for elevator shafts, so I assumed they were something else.
  18. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    The framed section in the foreground of this picture with the cables already placed was poured this morning. Any ideas where the main elevators will be, and where the ramp from P2 to P1 will be placed?
  19. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    I would imagine that wet conditions such as rain and snow are less than ideal for pouring cement, so there would be no need to have those people on site today.
  20. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    Pouring of the last quadrant on P2 is being performed today. Half of the foundation for P1 has also been built.