News   Jul 16, 2024
 398     0 
News   Jul 16, 2024
 509     2 
News   Jul 15, 2024
 1.3K     3 

Search results

  1. B

    Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)

    Documents are available now: Stage 2 ION South Terminus Evaluation Results and Preferred Location Map of Preferred South Terminal Location Map of South Terminal Alternative Locations Terminal Location Alternatives Evaluation Criteria Terminal Location Evaluation Results Presentation They're...
  2. B

    Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)

    Those grade separations also leave stage 2 as quite a lot higher grade a piece of infrastructure than 1... to the point that I have to agree about stage 1 that we may well at some stage be talking about substantial projects to speed run times through Kitchener (the problem is that every...
  3. B

    Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)

    Yeah... that's not at all how this works. There is going to be a recommendation, singular in the report and a vote by council to do something, not some wide open balloting process on a by option basis.
  4. B

    Transit Fantasy Maps

    No, the Milton terminating (as opposed to the Cambridge/Guelph) trains
  5. B

    Transit Fantasy Maps

    As in if the Midtown corridor happens, yes, I'd be inclined (in this configuration) to service it by redirecting the Milton trains to Scarborough via Midtown rather than introduce an additional service. The only riders it would seem to really significantly hurt are those boarding between Milton...
  6. B

    Transit Fantasy Maps

    Aside from my note about preferring Guelph to Cambridge, I’d observe again that given the corridor limitation OBR has north of Brampton there’s a lot to be said for a new ROW from Bolton to Orangeville instead of rebuilding OBR as it was. I’d also suggest that the trains out to Cambridge or...
  7. B

    Transit Fantasy Maps

    The more I look at Cambridge the fonder I get of extending Milton up the GJR with a riverfront station in Guelph. Especially in combination with a Fergus route to Cambridge I really have a hard time justifying Milton - Cambridge over it.
  8. B

    Transit Fantasy Maps

    What benefit is there to standard gauge? I get the desire to reduce interlining, I’d even get making it high floor if it’s REALLY meant to be a rapid transit line…. But being both light rail in that area and incompatible with the surface system just seems like a bad idea. Honestly, with the OL...
  9. B

    GO Transit Electrification | Metrolinx

    I agree at the end of the day a bypass is absolutely required, but without getting some degree of acceptance of electrfication we're back to stupid edge cases, like electrification never reaching Hamilton and the Durham extensions remaining diesel.
  10. B

    Transit Fantasy Maps

    Frankly I didn't even touch on VIA except to point out how I'd deal with capacity constraints at Bayview, but I think my ideal is Toronto - Brantford - London - Windsor/Detroit HFR, Toronto - Hamilton - St Catharines - Welland - Buffalo trains on a pretty low frequency and only maybe something...
  11. B

    Bradford Bypass (MTO, Hwy 400 - Hwy 404)

    Not much with 413 in the works. If 413 end up stopped and then gets revived There's probably probably a discussion to be had about pulling it's eastern end north, but honestly, demand being what it is, development where it is and the need for a new corridor east of the 404 as low as it is...
  12. B

    GO Transit Electrification | Metrolinx

    Honestly, I think there's going to have to be some element of legislative compulsion, and some kind of subsidy for joint operation areas.
  13. B

    GO Transit Electrification | Metrolinx

    Also significant that the Waterloo Spur ops actually de energize the overhead while CN is active. We really do need to find a way to make the Class 1s live with electrification but there’s going to be more to it than getting aggressive in negotiations.
  14. B

    Orangeville-Brampton Railway (OBRY)

    I am honestly starting to think that with VIA and GO both behaving the way they do the most realistic shot at service that will really serve the corridor well would be giving VIA the boot and Waterloo Region taking the lead on a dual function London - Guelph regional service that also runs a...
  15. B

    King Street (Streetcar Transit Priority)

    I'd love to know the leap of cop-brain that says throwing a streetcar operator into a holding pen thrown together in a film studio warehouse somehow 'makes sense' on the basis of a purported threat to the safety of the streetcar. Frankly the absolute best one sentence summary of the G20 was the...
  16. B

    Transit Fantasy Maps

    I've talked about pieces of this in various threads, but I threw together a sketch of my thoughts on the far western GTA and Grand River Valley. Aside from my interest in the area it's also what I'd consider an appropriate alternative use for Highway 413 funds, as well as a good mix of projects...
  17. B

    King Street (Streetcar Transit Priority)

    I brought up the g20 in reference to a vague recollection that TTC management told their people who got arrested during G20 that it was their problem despite having literally been arrested for doing their jobs. And the two I was talking about were separate from the off duty guy who got caught...
  18. B

    King Street (Streetcar Transit Priority)

    There were at least two on duty uniformed TTC employees tossed picked arrested for literally no reason. One being a collector the service seemed to think shouldn’t have been in his station after they closed it, and another a streetcar operator who had the door battered open by ETF because he...
  19. B

    VIA Rail

    And delivers a far worse product. As a Windsor only service the existing station is fine, but getting every train to Detroit is one of the most clearly worthwhile improvements west of Toronto (short of full public ownership what could even compete? the only thing in my mind would be bypassing...
  20. B

    King Street (Streetcar Transit Priority)

    Am I the only one with the ugly feeling that Leary’s response to this thing might be to try and hang the operator out to dry? I don’t seem to recall the TTC being very helpful to the employees TPS kidnapped during the G20.

Back
Top