News   Jul 15, 2024
 374     1 
News   Jul 15, 2024
 543     0 
News   Jul 15, 2024
 560     0 

Search results

  1. C

    Cycling infrastructure (Separated bike lanes)

    Meadowway update providing detour between Neilson and Conlins segments until other segments complete; I presume the segment connecting to Morningside park is now complete. Find it strange they opted for detour up Military Trail instead of Conlins (up to Ellesmere).
  2. C

    Metrolinx: Presto Fare Card

    whoa...someone's living in the future... :D
  3. C

    Cycling infrastructure (Separated bike lanes)

    For those cycling east of the Rouge along the waterfront, the City of Pickering has launched a Waterfront trail committee who had their inaugural meeting today, including details of the current/future work. Some points/images I thought were worth bringing forward from the meeting (east to...
  4. C

    Cycling infrastructure (Separated bike lanes)

    A little more detail added on this one... Durham Region's Meadoway site has added an interactive map including a nice addition temporary/interim routes where construction can be done to get a continuous trail the quickest. Comments/Suggestions can now be conveniently added via coloured pins on...
  5. C

    Metrolinx: Other Items (catch all)

    Presumably the Pickering/Whitby bridges is for finally fixing broken windows on the go station bridges that have been untouched in years (some going back to '19). Interesting there isn't a line for Durham/Scarborough brt; is that because it is an infrstructure (Ontario/Canada) project? I really...
  6. C

    Pickering 640 Liverpool Road | ?m | 3s | Liverpool Road LP | Cassidy + Company

    Couple of revised renderings from the applicant after receiving comments the original wasnt 'high quality'. First is looking north from Wharf with illustration of commercial at grade. Second are units along Wharf looking northwest. I'm not sure this sticks with a nautical theme...
  7. C

    Metrolinx: Other Items (catch all)

    Obligatory meme (sorry can't add links anymore for some reason):
  8. C

    Pickering 640 Liverpool Road | ?m | 3s | Liverpool Road LP | Cassidy + Company

    They've already been taking soul samples along Beachfront last year? and are finishing the washrooms on the Westshore and beach rehab on that side. If memory serves correct, the plan was to start next year (maybe 25) and close one side at a time (starting with the east side) until completion...
  9. C

    Toronto Rouge National Urban Park Visitor Centre | 6.99m | 1s | Parks Canada | Moriyama & Teshima

    I know it's not directly related to the visitors centre, but thought I'd add couple of shots I took today of bridges on the opposite side of the twyn rivers parking lot and near mast trail crossing. Not sure they'll met their end of spring deadline... But it's coming along.
  10. C

    Pickering 640 Liverpool Road | ?m | 3s | Liverpool Road LP | Cassidy + Company

    @yoshirocks702 is correct, the Beachfront Park will be getting an elevated boardwalk with seperate cycle lanes and the trail will divert back down to the beach. In addition, the whole point of the trail is to bring users close to waters edge and not just directions through neighborhoods. If we...
  11. C

    Pickering 640 Liverpool Road | ?m | 3s | Liverpool Road LP | Cassidy + Company

    This side of Frenchman's Bay is lacking waterfront trail that either provides views of the waterfront (lake/bay) or on a trail (mostly through residential streets). Don't know if this is even possible, but I asked local staff to see if looking at a small addition to the trail could be added here...
  12. C

    Ontario Science Centre

    We know the plan to move was brought up some years before the announcement. It is also entirely possible they knew the future of the building and decided not to do work. But again why keep it quiet at this junction is puzzling.
  13. C

    Ontario Science Centre

    I've asked this several times and the answer is always required maintenance and no timeline; yet no discernable work is/has been done for well over a year and a half. Nothing further if you probe with follow up questions which seems quite odd. Either the reasons why aren't shared internally, or...
  14. C

    GO Transit: Service thread (including extensions)

    We've had this discussion before but can't find... The schedules one thing and the customer service teams say another. I tried bringing it to their attention there is a slight difference but they didn't update. Essentially one (schedule) says no bikes at union period, full stop...and also on...
  15. C

    Eglinton East LRT | Metrolinx

    It may be a pipe dream, but that MSF is located (somewhat) near the old zoo monorail, which is being considered as a stretch goal to be reintroduced for their redesign. They are looking into funding for this or other technology to transport people around the property. As a regular user of...
  16. C

    Road Safety & Vision Zero Plan

    Although you can't see on outdated satellite imagery, there is one that was just installed here (near Antibes Dr and Don lake gate) within the past couple years.
  17. C

    Sheppard Line 4 Subway Extension (Proposed)

    His plan called for Sheppard subway to McCowan and Sheppard lrt to Neilson. Presumably extending the 'line' by different technology?
  18. C

    GO Transit: Service thread (including extensions)

    Isn't it triple moving to quad?
  19. C

    GO Transit: Service thread (including extensions)

    On the LSE side it may not be able to handle that service as the addition and modifications of tracks/bridges is still underway. If memory serves correct, the express trains won't return til summer '24 (at least that was the original plan).
  20. C

    Pickering Pickering Casino Resort | 51.45m | 15s | Pickering Developments | CGL Architects

    How do you fit residential next to Porche experience? Isn't that a conflict? Similarly, I thought there were issues with casinos being close to residential (societal concerns)?

Back
Top