News   Jul 15, 2024
 282     0 
News   Jul 12, 2024
 1.8K     1 
News   Jul 12, 2024
 1.3K     1 

Search results

  1. H

    Roads: Ontario/GTA Highways Discussion

    And also keep getting on and off the highway waste a lot of time.
  2. H

    Toronto Ontario Line 3 | ?m | ?s

    Do you have ideas for other portals?
  3. H

    GO Transit: Service thread (including extensions)

    They do plan to run hourly trains to Confederation though. see link
  4. H

    TTC: Other Items (catch all)

    If they have the bus, sure.
  5. H

    Roads: Ontario/GTA Highways Discussion

    The problem is driving have mostly fixed cost, no matter how much you drive, so people drive wherever they go; while transit has a variable cost based on the number of trips.
  6. H

    Roads: Ontario/GTA Highways Discussion

    It would be easier to just toll all the express lanes with sensors and cameras at the transfer lanes. Tolling 1 lane: High price for 1 lane Tolling 3 lanes: Lower price for 3 lanes
  7. H

    Danforth Line 2 Scarborough Subway Extension

    Another possibility is the LRT goes along 401 all the way to Meadowvale, like the southern portion of the REM. Not sure where the stops may be but it can attract more drivers to ride the LRT instead. BRT can be as frequent as LRT with the Mississauga Transitway. One of the problems in Ottawa...
  8. H

    YRT/Viva Construction Thread (Rapidways, Terminals)

    Will have to wait until GO trains are every 15 mins or less, then it will further emphasize YRT's infrequent bus connections. Side note: It is cheaper to take a few stops on GO Transit in York Region than taking YRT.
  9. H

    YRT/Viva Construction Thread (Rapidways, Terminals)

    Not outside rush hour though, with a bus every 16 or 34 mins (not a factor of 60) while the train comes every hour.
  10. H

    GO Transit: Service thread (including extensions)

    The trip to Niagara is horribly slow by bus than by a car. Good that they added an express one temporary.
  11. H

    YRT/Viva Construction Thread (Rapidways, Terminals)

    And the buses are so infrequent.
  12. H

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    How about a 4 lane Gardiner and a 4 lane Lake Shore?
  13. H

    Danforth Line 2 Scarborough Subway Extension

    Bus loop would only be beneficial to one direction, as the other direction will unavoidably need to wait for left turns, which can take ages.
  14. H

    Danforth Line 2 Scarborough Subway Extension

    I think they planned more service east of the station than west of the station.
  15. H

    GO Transit: Service thread (including extensions)

    If CP ever agreed on Metrolinx to build new tracks, it might as well be an automated subway line like the Sydney metro.
  16. H

    Danforth Line 2 Scarborough Subway Extension

    They closed Downsview o some weekends.
  17. H

    Danforth Line 2 Scarborough Subway Extension

    No, this is an extension of the Bloor-Danforth Line.

Back
Top