News   Jul 12, 2024
 1.5K     0 
News   Jul 12, 2024
 1.2K     1 
News   Jul 12, 2024
 414     0 

Search results

  1. Krypto98

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Knowing metrolinx I'll get an operating bulletin about this opening the day before... they did the same with Nickel/CP connecting track on the weston
  2. Krypto98

    GO Transit Fleet Equipment and other

    Ever since the KCS merger came into the news you dont see as many trains on the Galt between Guelph Junction and west toronto... mactier is still pretty busy
  3. Krypto98

    GO Transit Fleet Equipment and other

    Though with the amount of freight traffic the Galt sees these days I would certainly be inclined to think it's a passenger only route
  4. Krypto98

    Roads: Ontario/GTA Highways Discussion

    Also the collector at Kennedy going east... if you are in the right most lane you have to do 3 lanes switches left to stay on
  5. Krypto98

    GO Transit Fleet Equipment and other

    Keep in mind, when I saw 206 at mac (I had to move it from R yard cause we can't hump passenger coaches) the A end was facing north/east, so it will need to be wyed at some point. It was also pain to move since you can't ride it since metrolinx removed the stur ups and handles on the outside...
  6. Krypto98

    GO Transit: Construction Projects (Metrolinx, various)

    Are they planning of adding CTC to track 4 eventually and extending that to CN Peel and keeping future track 5 as rule 105 or just just keeping both as a 105 lead
  7. Krypto98

    GO Transit: Construction Projects (Metrolinx, various)

    So why it remains 45 mph (on my timetable it shows up as a PSO still) even though I think it can accommodate 60-70mph?
  8. Krypto98

    Caledon-Vaughan GO Rail Line

    OMG WHY DID CP BUILT THROUGH GREEN BELT GRRRRRR. In all seriousness, operationally, CTC ends north of Bolton and its all single track ABS/OCS dark territory control to Mactier. I don't think we will see more than a handful of trains north of Bolton IF we are lucky enough to get trains to Bolton
  9. Krypto98

    GO Transit: Construction Projects (Metrolinx, various)

    Yeah that's about mile 58 on the Guelph Sub and as far as I know the only bridge there...
  10. Krypto98

    GO Transit: Service thread (including extensions)

    Are you sure about that? Major upgrades would need to be done to the Fergus spur... at the current moment it's single track R105 territory with 10/15 mph maximum speed. And per some old ETTs the maximum speed was 20-30 mph with OCS (dark territory mainline) At the current moment the Galt sub...
  11. Krypto98

    GO Transit: Service thread (including extensions)

    Haha yeah I've seen this too now In all seriousness... don't ride the outside. I've been professionally trained on riding rail cars on the outside and if you don't know what you are doing you'll get hurt very badly...
  12. Krypto98

    Caledon-Vaughan GO Rail Line

    I meant to say at the current moment... now if more tracks are added yeah definitely works
  13. Krypto98

    GO Transit: Service thread (including extensions)

    Noooooo now I can't ride the coach on the outside... Actually they would probably be as bad to ride as a loaded lumber car... I've never liked riding those...
  14. Krypto98

    GO Transit: Service thread (including extensions)

    Maybe short staffed but seeing as they aren't hiring qualified conductors that have applied I'm guessing they don't really need people now as urgently
  15. Krypto98

    Caledon-Vaughan GO Rail Line

    The mactier doesn't have enough capacity for both go transit and cp operations Going south yes from Nickle towards west toronto which CN uses for their overnight interchange job, a northward connector doesn't exist and optimally could be built at Nickle. Then GO transit movements could stop on...
  16. Krypto98

    GO Transit: Service thread (including extensions)

    I was thinking more of charging up the airbrakes to release?
  17. Krypto98

    Metrolinx: Other Items (catch all)

    They have been there forever... at least a month at this point... I actually put the flat cars there around mid December...
  18. Krypto98

    GO Transit: Service thread (including extensions)

    I was just thinking about this when working 546 the other day... for the Bowmanville extension wouldn't it better to have the control locations at CN Oshawa West and MX Thickson intersect (similar to CN Boyne and CP Reynolds on the Bala) so that GO could cross over to the via platform and...
  19. Krypto98

    GO Transit Fleet Equipment and other

    I don't even know what a K5LA is. Plus you won't be very likable here if you demand things from people

Back
Top