News   Jul 12, 2024
 1.3K     0 
News   Jul 12, 2024
 1.1K     1 
News   Jul 12, 2024
 391     0 

Search results

  1. B

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    Sounds like the union station capacity issue needs some out of the box thinking. How about retrofitting the GO bilevel coaches with doors on the top level and essentially doubling the platform area with a second platform level.
  2. B

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Yes I did, I would argue that if designed well, it wouldn't use up too much park space. The park space is really only used 6 months of the year in summer while the road would be useful for 12 months of the year.
  3. B

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Why don't we reroute car traffic on Hurontario/Main.
  4. B

    Roads: Keep the Gardiner, fix it, or get rid of it? (2005-2014)

    How about this: 2 lanes/direction of the Gardiner go to one-way Front/Wellington which will be 3 lanes wide with "green waves". 1 lane/direction goes to Fort York Blvd/Bremner Blvd.
  5. B

    Highway 427: Highway or Homes

    Personally I think that the current plans for the 427 extension look pretty good. In the long term I believe going up to Barrie makes the most sense as it would ease traffic on the death trap they call highway 400. In addition, I am propsing a second highway 4## which would run from the 400...

Back
Top