News   Jul 12, 2024
 1.3K     0 
News   Jul 12, 2024
 1.1K     1 
News   Jul 12, 2024
 387     0 

Search results

  1. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    Some shots of the north side of the building and the art installation.
  2. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    This image was taken Aug. 28, 2021 from High Park. Also of note: Signs are up on the west tower offering the ground floor retail space for lease (3,391 sf, 10 years according to this website - https://www.koolspace.com/mirabella)
  3. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    The top is almost there on East Tower.
  4. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    Yes, it's largely cleared and "No Trespassing" signs are up across the lot that will eventually be home to this: https://urbantoronto.ca/database/projects/2002-lake-shore-west. There appeared to be water main / drainage work being done earlier this spring.
  5. S

    Toronto Bijou on Bloor | 42.1m | 12s | Plaza | BDP Quadrangle

    More scaffolding and plywood up on Bloor this morning, and the promotional sign appears to be coming down.
  6. S

    Toronto Bijou on Bloor | 42.1m | 12s | Plaza | BDP Quadrangle

    Demolition has begun at the back of the site. This is the rear of the former Earth Bloor West restaurant.
  7. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    Mirabella seeks minor variance to convert some of the space currently designed and allocated for visitor parking into resident parking and residential locker space. Application proposes to reduce the visitor parking supply to 86 spaces (a reduction of 22 spaces) in comparison to the current...
  8. S

    Toronto Mirabella Condominiums | 120m | 38s | Mirabella Dev Corp | Scott Shields

    I found some new details about the public art display on the northern facade in this new paid content story from the National Post. "Motion in Air, a stunning piece of public art by Jennifer Macklem, will adorn the northern facade of the podium that connects Mirabella’s two towers, overlooking...
  9. S

    Toronto Junction Factory | 24.38m | 7s | Terra Firma Homes | AJT Architects

    Front of the building at the corner of Durie St & Dundas St West: Behind the building near the intersection of Beresford Ave and Dundas St. West
  10. S

    Toronto 2002 Lake Shore West | 122m | 36s | Marlin Spring | Graziani + Corazza

    It looks like some preliminary work is happening. Small dig equipment was there and holes have been dug and taped off.
  11. S

    Toronto Bijou on Bloor | 42.1m | 12s | Plaza | BDP Quadrangle

    Fairly quiet still at the site. A streetlamp on the corner was removed this week (see the orange cone in the bottom photo). Demolition work has begun inside the Humber Cinema.

Back
Top