  1. O

    Ottawa Transit Developments

    "Light rail" is really just branding. Think of it more like light metro, because that's how it behaves.
  2. O

    Ottawa Transit Developments

    The OCS was repaired overnight and service resumed this morning. https://www.cbc.ca/news/canada/ottawa/lrt-broken-wire-fixed-oc-transpo-ottawa-1.5430467 We might learn more details about what happened at a press conference at 10:30.
  3. O

    Ottawa Transit Developments

    Of the 17, two are meant to be kept as spares. One is a hot spare, the other is a maintenance spare. Only 15 trains would ever be out in service. We know for a fact that all 34 vehicles function as they have all been seen in operation. It's just a matter of keeping 14 and 15 trains running...
  4. O

    Ottawa Transit Developments

    34 vehicles are complete and handed over to the city (all for Stage 1). And additional 38 vehicles are currently anywhere between testing and assembly stages. Just remember that they operate in two-vehicle pairs, so 34 vehicles means 17 operational trains.
  5. O

    Moose Rail (National Capital Region)

    Technically, their position is that Cabinet rescinded one of two orders given by the CTA. A prior order by the CTA is technically still standing..
  6. O

    Ottawa Transit Developments

    No, they will be rotated into regular service once they are fully tested and certified.
  7. O

    Ottawa Transit Developments

    Turns out it didn't mean anything too bad. The documents are all up on the new site now. https://ottawa.ca/en/planning-development-and-construction/major-projects/stage-2-light-rail-transit-project/planning-and-consultation-background
  8. O

    Ottawa Transit Developments

    That site is missing many of the reports and other documents that were featured on the old site which is what concerned most people. The city has stated that the archived documents will be available on that site sometime soon.
  9. O

    Ottawa Transit Developments

    Is this actually true though?
  10. O

    Ottawa Transit Developments

    In my opinion, what kills the Citadis (as-is) isn't the low floor design. The wheel hubs don't have a huge impact on passenger capacity. Yes, it'll be slightly lower than a high floor vehicle, but it's been shown that the low floor vehicles can and will be able to carry enough people. With doors...
  11. O

    Ottawa Transit Developments

    That issue doesn't require new trains to be completed. It requires the trains they have to be operational. The plan called for a system to carry some number of ppdph. The platforms we have are long enough to achieve that. They are built to be extendable in the future when longer trains will be...
  12. O

    Ottawa Transit Developments

    There were 17 pairs completed for Stage 1 totaling 34 vehicles. Some currently-unknown number of vehicles are in various stages of assembly at Belfast, but the number is greater than 4. 15 trains to provide 3 min service consistently. 34 vehicles were ordered with another 4 added through PTIF...
  13. O

    Ottawa Transit Developments

    As far as ION goes, it's harder for it to fall apart from computer problems because the automatic train protection system hasn't even been brought online yet. They're running full manual.
  14. O

    Ottawa Transit Developments

    It looks like fares will probably be frozen for everyone for at least 3 months using the money withheld from RTM.
  15. O

    Ottawa Transit Developments

    Jumping way further into the future here: The city held its first open house regarding the current status of the Barrhaven LRT and VIA Grade Separation study. The display boards are available here...
  16. O

    Ottawa Transit Developments

    They had gone through some pretty disappointing orders with New Flyer and Novabus in the decade before.. the Orion VI's were probably the second best bus in the fleet after the D40i at that point.
  17. O

    Moose Rail (National Capital Region)

    That's all federal land, so not a chance... other than for more government buildings.
  18. O

    Ottawa Transit Developments

    The problem with the transitway was that not every bus would take me where you needed to go. For instance, I would have rather waited for the route 44 to show up than to take a 97 to Hurdman... and then wait for the 44.
  19. O

    Moose Rail (National Capital Region)

    It would be very curious if the city successfully argued that they are continuing to fulfill their railway duties by providing a pedestrian crossing, especially since those laws aren't written around passenger railways anyway. In that case, I believe he was referring to MOOSE being the...
  20. O

    Moose Rail (National Capital Region)

    I assume the CTA will follow due process which may take some time to review MOOSE's full claim, but otherwise yes.