News   Jul 12, 2024
 1.2K     0 
News   Jul 12, 2024
 999     1 
News   Jul 12, 2024
 371     0 

Search results

  1. S

    Barrie Barrie Lakeshore Developments | 139m | 45s | SmartCentres | Turner Fleischer

    I've seen so many development plans for towers downtown Barrie over the years. I have a tough time believing that this would come to reality. Especially the hotels, what would be the reason for people staying there?
  2. S

    Toronto 1200 Bay | 326.5m | 87s | ProWinko | Herzog & de Meuron

    Mechanical floors don't necessarily have to be located in the penthouse of the building, for example 81 Bay St is almost at ground level. The water for the cooling towers would just be piped to the mechanical floor on a lower level, for boilers the exhaust could easily be ran in a mechanical...
  3. S

    Vaughan Cortellucci Vaughan Hospital | ?m | 11s | Plenary Health | Stantec

    Then why didn't they make the hospital and architectural dream if all these things you mentioned are true? Additional costs can really scale like that, especially with all the trades and engineers that are involved in these projects. What are some ways to make it look nicer without adding...
  4. S

    Vaughan Cortellucci Vaughan Hospital | ?m | 11s | Plenary Health | Stantec

    How do you know it doesn't have to be that way? If you want this hospital to "look" nicer you are looking at different materials used for the shell, or rearranging floor plans, which could ad around an additional 300m dollars. It's a hospital, designed to treat patients as effectively and...
  5. S

    Toronto Hospital For Sick Children: Patient Support Centre | 99.06m | 22s | Sick Kids | B+H

    I used to do excavations on a smaller scale, but from my experience this is how its done. The site surveyor will mark an elevation level on an existing structural element, or on a stake that's been driven into the ground. The excavating crew will use a laser level to determine how far they need...

Back
Top